Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "TS9"

13 unique locations (96 components)

Sort by: Relevance A-Z Components MW Date
46 Station Road Stokesley Middlesbrough TS9 4AA (7 components)

Gas CHP engines - two 1.47MW and one 1.51MW. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(Estimated)
46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)

Gas CHP engines in commercial horticultural usage with no auxilliary load

Active • 2027-28 (T-4), 2025-26 (T-4) ...
20.43 MW (Est from CMU)
(Estimated)
No capacity data
(Estimated)
Quorn Foods, Station Road, Stokesley North Yorkshire, TS9 7AB (4 components)

CHP Unit behind industrial customer

Active • 2018-19 (T-1)
No capacity data
(Estimated)
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (27 components)

(Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) …

Active • 2028-29 (T-4), 2024-25 (T-4) ...
103.57 MW (Est from CMU)
(Estimated)
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)

CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.23 MW (Est from CMU)
(Estimated)
TS9 (19 components)

Domestic demand turn down

Active • 2027-28 (T-4), 2025-26 (T-1) ...
103.33 MW (Est from CMU) (part of 103.33 MW aggregated CMU)
(Estimated)
Brook Road Ivybridge Devon PL21 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
High Keep Fold Wakefield West Yorkshire WF4 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
Sandbanks road, BH14 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
No capacity data
(Estimated)
Loading map...