Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "The Tannery, Huish Episcopi, Langport TA10 9HG"

1 unique locations (14 components)

The Tannery, Huish Episcopi, Langport TA10 9HG (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.48 MW
(Estimated)
EDF Energy (Thermal Generation) Limited, Cottam Power Station, Outgang Lane, Cottam, Retford, DN22 0NP (35 components)
• Cottam Power Station CMU 1 CT1-18 = 100% (T_COTPS-1) + 25% (T_COTPS-S)
• Cottam Power Station CMU 2 CT2-18 = 100% ( T_COTPS-2) + 25% (T_COTPS-S)
• Cottam Power Station CMU 3 CT3-18 = 100% (T_COTPS-3) + 25% (T_COTPS-S)
• ... and 2 more unique descriptions
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1528.52 MW
(Estimated)
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (105 components)
• West Burton A Power Station CMU 1 WA1-18 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 1 WA1-19 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 1 WA1-20 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• ... and 2 more unique descriptions
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2472.54 MW
(Estimated)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (27 components)
• The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 4.981MW and additional PSEUDO MPAN's are fitted.
• The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 5.535MW and additional PSEUDO MPAN's are fitted.
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• ... and 2 more unique descriptions
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
No capacity data
(De-rated)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (5 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2021-22 (T-1) ...
0.50 MW
(Estimated)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (14 components)
• 7 MW of Battery Storage located at Grantham. (3)
• Battery Storage located at Grantham. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.77 MW
(Estimated)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(De-rated)
Loading map...
Showing 7 locations