Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "WA9"

10 unique locations (73 components)

Sort by: Relevance A-Z Components MW Date
M&D Business Park, St Helens, WA9 5EA (1 component)

10 x 2MW gas generator units to be installed on designated land within a compound at M & D business Park, St Helens, WA9 5EA

Inactive • 2023-24 (T-4)
19.00 MW
(Estimated)
Beresford Street, St. Helens, Merseyside, WA9 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
(Estimated)
Elton Head Road, St Helens, Merseyside WA9 5AX (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
No capacity data
(De-rated)
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.52 MW
(Estimated)
Hurst Property Management Burtonhead Road St. Helens WA9 5DS (1 component)

30 MW Storage facility located at Ravenhead Road.

Inactive • 2021-22 (T-4)
No capacity data
(De-rated)
15.48 MW
(Estimated)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (7 components)
• Battery Project on Greenfield Site
• New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.32 MW
(Estimated)
M & D Business Park, Burtonhead Road, St. Helens, WA9 5EA (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines

Inactive • 2022-23 (T-4)
No capacity data
(De-rated)
WA9 (20 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
22.58 MW
(Estimated)
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (18 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.14 MW
(Estimated)
Loading map...
Showing 10 locations