Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "WOOD LANE ROTHWELL LEEDS LS26"

1 unique locations (6 components)

WOOD LANE ROTHWELL LEEDS LS26 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW (Est from CMU) (part of 28.04 MW aggregated CMU)
(Estimated)
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (1 component)

2 hr duration Battery Energy Storage System located in England

Active • 2028-29 (T-4)
8.79 MW
(Estimated)
Denison Road, Selby, North Yorkshire YO8 8AN (19 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
(Estimated)
Kingdom Avenue, Westbury, Wiltshire, BA13 4FG (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Active • 2025-26 (T-1)
14.21 MW
(Estimated)
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.09 MW (Est from CMU) (part of 8.09 MW aggregated CMU)
(Estimated)
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Heysham 2 Power Station CMU 8: [HY2823] T_HEYM28 + (50% x T_HEYM2-D)
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
No capacity data
(Estimated)
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (9 components)
• New build battery storage 50.000MW/50.000MWh one hour duration asset
• To be confirmed once components are known
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.10 MW (Est from CMU) (part of 37.10 MW aggregated CMU)
(Estimated)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (10 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31.39 MW (Est from CMU) (part of 31.39 MW aggregated CMU)
(Estimated)
No capacity data
(Estimated)
Ratcliffe-on-Soar Nottingham NG11 0EE (77 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3602.30 MW (Est from CMU) (part of 3602.30 MW aggregated CMU)
(Estimated)
Wellington Street, Oldham, Lancashire OL4 1SA (4 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
22.21 MW (Est from CMU) (part of 22.21 MW aggregated CMU)
(Estimated)
Wincham Lane, Wincham, Northwich, CW9 6DE (15 components)
• N/A
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Loading map...
Showing 14 locations