Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "YO17 8JF"

4 unique locations (10 components)

Sort by: Relevance A-Z Components MW Date
Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (5 components)

Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine

Inactive • 2019-20 (T-1), 2018-19 (T-1)
No capacity data
Knapton Generating Station, East Knapton, Malton, YO17 8JF (2 components)
• Natural gas fired reciprocating engines installed upon designated land within the existing Knapton Generating Station facility. The CMU output will have a combined total output of 40.9 MWe.
• Natural gas fired reciprocating engines installed upon designated land within the existing Knapton Generating Station facility. The CMU output will have a combined total output of 9 MWe.
Active • 2024-25 (T-4)
No capacity data
Malton Road, Malton, West Knapton Yorkshire, YO17 8JF (2 components)

A 28MW new build of battery storage unit. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
16.82 MW
(Official)
Malton Road, Malton YO17 8JF (1 component)

A 40MW new build of battery storage unit.

Inactive • 2027-28 (T-4)
6.16 MW
Loading map...
Showing 4 locations