12 unique locations (74 components)

Boots, Driffield Middle St Sth - North Humber and East Ridings YO25 6PS (1 component)

Commercial sites

DSR Part of OAKTREE POWER GROUP LIMITED OAKTREE POWER LIMITED YO25
Active • 2024-25 (T-1)
0.80 MW
(Estimated)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (10 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
DSR Storage (Duration 1h) Part of The Shell Petroleum Company Limited LIMEJUMP LTD YO25
Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.67 MW
(Estimated)
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
• CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 20kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 28 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 7 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/20kV step up transformer and a 630A 20 kV Ring Main Unit (RMU);
• CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered, and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 16 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 8 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU);
Active • 2027-28 (T-4), 2026-27 (T-4)
3.46 MW
(Estimated)
Fridaythorpe Driffield YO25 9RT (3 components)

Agriculture and animal feeds

Inactive • 2017-18 (TR)
No capacity data
(De-rated)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (2 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2025-26 (T-1), 2023-24 (T-1)
9.10 MW
(Estimated)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.10 MW
(Estimated)
T Soanes Poultry Church Hill Road Middleton-on-the-wolds Driffield YO25 9UG (1 component)

2MW of DSR

DSR Part of The Shell Petroleum Company Limited LIMEJUMP LTD YO25
Inactive • 2020-21 (T-1)
No capacity data
(De-rated)
T Soanes Poultry Church Hill Road Middleton-on-the-wolds Driffield YO25 9UG (4 components)

2MW of DSR

DSR Part of The Shell Petroleum Company Limited LIMEJUMP LTD YO25
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
1.72 MW
(Estimated)
YO25 (42 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
DSR EV Charging Part of Octopus Energy Group Limited AXLE ENERGY LIMITED YO25
Active • 2025-26 (T-4), 2025-26 (T-1) ...
166.36 MW
(Estimated)
YORKSHIRE WATER PLC, TOPHILL WATER TREATMENT WORKS, TOPHILL LOW, CRANSWICK, DRIFFIELD, YO25 9RH (1 component)

On site reduction in consumption

DSR Part of Lyford Power Limited Waterswallows Energy Limited YO25
Active • 2024-25 (T-1)
14.00 MW
(Estimated)