Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

3926 unique locations (20920 components) - Page 1 of 158

100 Cathcart Rd, Glasgow G42 7BH (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
11 BURSOM ROAD, LEICESTER, LE4 1BS (1 component)

2.52MW Battery Storage located at PepsiCo Leicester factory

Active • 2024-25 (T-4)
133 Balornock Road, Glasgow, G21 3UW (13 components)

Generators on hospital site

Active • 2024-25 (T-1), 2023-24 (T-4) ...
150 Maylands Ave, Hemel Hempstead Industrial Estate, Hemel Hempstead HP2 7DF (3 components)

3MW - 3,45MWh Battery Energy Storage System

DSR BRYT ENERGY LIMITED Not Prequalified HP2
Active • 2025-26 (T-4), 2022-23 (T-1)
160 Corporation Road, Newport, Gwent, NP19 0WF (11 components)
• 0.39MW Battery Storage located at Newport Bus depot
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
172-174 Rye Lane PeckhamLondon, London, SE15 4NB (10 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (19 components)
• Office site with behind the meter back up generation
• Office site with behind the meter generation
• Office site with behind the meter generation.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
0.81 MW
20 Marine Esplanade, Leith Docks, EH6 7LU (1 component)

1X diesel generator with a gross capacity of 2.900MW

Active • 2025-26 (T-1)
20 Marine Esplanade, Leith Docks, Leith, EH6 7LU (1 component)

1x diesel generator with a total rated gross power capacity of 2.900 MW

Active • 2024-25 (T-1)
2600 John Smith Drive, Oxford, OX4 2JY (28 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2025-26 (T-4), 2024-25 (T-4) ...
28th Avenue, Yorkshire, Hull, HU6 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
2 Bar Lane, York, YO51 9LS (109 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2 Ford St, Coventry CV1 5WT (6 components)

1.2MW Battery Storage located at National Express Coventry

Active • 2025-26 (T-4), 2024-25 (T-4) ...
2 Snaith Rd, Pollington, Goole DN14 0AT (1 component)

Load from industrial process

Active • 2025-26 (T-1)
301 Camberwell New Rd, Camberwell, London, SE5 0TF (11 components)
• 1.26MW Battery Storage located at Abellio Walworth depot
• Battery Storage and demand reduction located at Abellio Walworth bus depot
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
318 Edinburgh Rd, Brakes Newhouse, Motherwell, ML1 5SY, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1)
37 Wenlock Way, Leicester LE4 9HU (4 components)

bus depot

Active • 2027-28 (T-4), 2026-27 (T-4) ...
3 Kelvin Way, West Bromwich B70 7LH United Kingdom (2 components)

Industrial sites

Active • 2025-26 (T-1), 2024-25 (T-1)
44-48 E Dock St, Dundee DD1 3JS (7 components)

Bus depot site

Active • 2027-28 (T-4), 2026-27 (T-4) ...
5 Greenock Rd, Inchinnan, Renfrew PA4 9PG (8 components)

Bus depot site

Active • 2027-28 (T-4), 2026-27 (T-4) ...
7 Market Street, Manchester, M1 1WT (11 components)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Active • 2024-25 (T-4), 2023-24 (T-4) ...
AB10 (1 component)

Domestic demand turn down

Active • 2024-25 (T-1)
0.04 MW
AB12 (7 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.04 MW
Loading map...
Showing 25 locations