Storage (Duration 2h)

305 unique locations (1183 components) - Page 1 of 13

132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-4)
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (5 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2024-25 (T-4), 2023-24 (T-4) ...
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.93 MW
Abbey Home Farm, Burford Road, Cirencester, GL7 5HF (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
adjacent to Kilmarnock South Substation KA1 3TN (2 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
Active • 2026-27 (T-4)
47.26 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Active • 2027-28 (T-4), 2026-27 (T-4)
23.09 MW
Aikengall 2a Wind Farm Innerwick EH42 1SG (2 components)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.

Active • 2027-28 (T-4), 2024-25 (T-1)
6.70 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (10 components)
• Battery storage plant
• Existing generating battery storage unit.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.28 MW
Arran View Jameston Farm Dalry North Ayrshire KA24 4EY (1 component)

13 x 3.800MW / 7.491MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY

Active • 2026-27 (T-4)
11.79 MW
Ashley Clinton Estate, Milford-on-Sea, Lymington, SO41 0LA (1 component)

A standalone 0.949MW BESS connected directly to the DNO network

Active • 2025-26 (T-1)
0.26 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
• New build battery storage CMU with CMU ID 24AUC1
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.55 MW
Barleylands Barleylands Road Billericay Essex CM11 2UD (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
11.67 MW
Barton Hill Way, Torquay, TQ2 8JG (7 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will …
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.26 MW
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4), 2025-26 (T-1) ...
1.79 MW
Beeston Park Farm, Ridge End Fold, Marple, Stockport, SK6 7EX (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Bengrove Farm, Base Lane, Sandhurst, Gloucestershire, GL2 9NU (1 component)

CMU ID 22BEN4, a new build battery storage CMU

Active • 2026-27 (T-4)
8.66 MW
Birch Road, Colchester CO2 0EJ (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Active • 2027-28 (T-4), 2025-26 (T-1)
3.10 MW
Blandford Road, Poole, BH16 6AB (5 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Active • 2026-27 (T-4), 2025-26 (T-1) ...
4.44 MW
Boot Lane, Sandbach, Cheshire CW11 3PY (2 components)
• 20MW of Battery Energy Storage Systems
• 26.000MW of Reciprocating Engines
Active • 2025-26 (T-4)
Bristol Avenue, Blackpool, FY2 0JF (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.55 MW
Loading map...
Showing 25 locations