Storage (Duration 4h)

54 unique locations (293 components) - Page 1 of 3

24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of a battery storage asset
Active • 2024-25 (T-4), 2023-24 (T-4) ...
adjacent to Kilmarnock South Substation KA1 3TN (12 components)

Lithium ion battery storage plant

Active • 2026-27 (T-4), 2025-26 (T-1)
150.05 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (7 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.46 MW
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2025-26 (T-1) ...
3.68 MW
Dragons Lane, Moston, Sandbach, CW11 3QH (2 components)

12 MW Connection 48 MWh Distribution unit

Active • 2026-27 (T-4), 2023-24 (T-1)
5.50 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation
• Lithium ion battery storage plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.82 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (60 components)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• Eggborough Power Station is an existing coal-fired power station located at Eggborough, 9km south of the town of Selby in …
• New build Combined Cycle Gas Turbine unit 1 at Eggborough power station.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2025-26 (T-1), 2024-25 (T-1)
2.58 MW
Heysham Road, Bootle, L30 6TU (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land Adjacent to No 13 Westerton Road Keith, Moray, Scotland AB55 5FA (2 components)

50MW of BESS to be installed within existing Rotating Stabiliser site.

Active • 2026-27 (T-4), 2025-26 (T-4)
8.48 MW
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (23 components)

Lithium ion battery storage plant

Active • 2028-29 (T-4), 2026-27 (T-4)
174.73 MW
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land at Exeter College Future Skills Centre, Silverdown Office Park, EX5 2LJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Land at Hammonds Drive, Eastbourne BN22 8QJ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1)
0.11 MW
Loading map...
Showing 25 locations