Combined Cycle Gas Turbine (CCGT)

28 unique locations (135 components) - Page 1 of 2

Ashland Farm Beck Lane Skegby Sutton in Ashfield NG19 6PG (2 components)

New Build gas fuelled generation station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Basin Road South, Portslade, East Sussex, BN41 1WF (7 components)
• Combined Cycle Gas Turbine plant
• Existing Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
381.99 MW
Basin Road South. Portslade. East Sussex. BN41 1WF (5 components)

Combined Cycle Gas Turbine plant

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (10 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Corringham, Stanford-le-Hope, Essex SS17 9LP UK (2 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land …

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL (4 components)
• Deeside CCGT Power Station.
• Deeside CCGT Power Station. Please note: The TEC deferral box has been ticked on the CMU Main Page. The text on the EMR Portal screen mentions Rule 3.6.3(b) and the commitment to secure TEC by 18 months before the Delivery Year. DEEP_1 is applying for the Supplementary Auction only and therefore this option has been used in relation to Rule 3.10A.2, where TEC is required by 6 months prior to the Delivery Year.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Drax Power Station, Selby, YO8 8PH (1 component)

New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site

Inactive • 2023-24 (T-4)
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW (2 components)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2028-29 (T-4)
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (3 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (4 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (2 components)

Combined Cycle Gas Turbine plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (9 components)
• Combined Cycle Gas Turbine plant
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (3 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Inactive • 2021-22 (T-4)
Knottingley Power Limited Knottingley CCGT Power Station Common Lane Knottingley West Yorkshire WF11 8DA (4 components)
• Knottingley Unit 1 is a combined cycle gas turbine generating unit
• Knottingly Unit 2 is a combined cycle gas turbine generating unit
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (2 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Inactive • 2021-22 (T-4)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (7 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Severn Power Station West Nash Road Nash Newport NP18 2BZ (17 components)
• Existing CCGT Unit
• Existing CCGT Unit which is to be refurbished
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2027-28 (T-4) ...
773.08 MW
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (4 components)
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 25 locations