Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

7156 unique locations (20032 components) - Page 1 of 287

Sort by: A-Z Components MW Date
1020 CENTRE PARK, WARRINGTON WA1 1QL (1 component)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.

Inactive • 2020-21 (T-4)
1020 CENTRE PARK, WARRINGTON WA1 1QY (3 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
1020 SLUTCHERS LANE, WARRINGTON, WA1 1QL (3 components)

gas generation

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
106 Scrubs Lane, Willesden, NW10 6QY (2 components)

"EMR European Metal Recycling 106 Scrubs Lane, Willesden, NW10 6QY The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
1092 Ransomes Way, Ipswich IP3 8TF, UK (1 component)

16MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2022-23 (T-4)
112 Beddington Lane, Beddington CR0 4TB (6 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
112 Beddington Lane, Croydon, CR0 4TB (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
118 Gawber Road, Barnsley, S75 2EP (2 components)

Gas Fired CHP

KIWI POWER LTD Rejected S75
Inactive • 2017-18 (T-1)
120 London Wall, London EC2Y 5ET (2 components)

This is an office building with large chillings

Inactive • 2017-18 (TR)
125 Cheston Road Birmingham B7 5EA (1 component)

Energy centre comprising of lean burn, acoustically treated natural gas reciprocating engines.

Inactive • 2022-23 (T-4)
13 - 18 Queen Street, Oxford, OX1 1AB (1 component)

DSR Component providing load turn down at a retail store

Inactive • 2021-22 (T-4)
13-18 Queen Street, Oxford, OX1 1AB (6 components)

DSR component providing load turn down at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
132 Manchester Road, Carrington, Trafford, Greater Manchester, England, M31 4AY, (1 component)

Hydrogen Production plant consisting of three of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.

Inactive • 2027-28 (T-4)
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (5 components)
• 3 x 1.2MW gas CHP in a hospital environment.
• 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
150 Maylands Avenue, Hemel Hempstead, Hertfordshire, HP2 7DF (2 components)

Back up generator at a data centre

Inactive • 2018-19 (T-1)
150 Maylands Avenue, Hemel Hempstead, Herts, HP2 7DF (1 component)

DSR Component providing load turn down at a data centre

Inactive • 2021-22 (T-4)
15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
160 Ipswich Road, Stoke Holy Cross, Norwich NR14 8PQ, UK (3 components)
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each …
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
16-18 Stall Street, Bath, BA1 1QB (5 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
165 Fordhouse Lane Stirchley Birmingham B30 3AG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Inactive • 2028-29 (T-4)
4.19 MW
167 - 600 Hollands Recycling, Bentley Road South, Darlaston, WS10 8LN (9 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
173 High Street, Cheltenham, United Kingdom, GL50 1DF (6 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
174 - 601 Farnham Road, Upper Froyle, Alton, GU34 4JD (9 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
17 Oaktree Road Fen Drayton Cambridge CB24 5SS (3 components)

Two gas CHP engines 1.42MW and 1.42MW. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 25 locations