Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

145 unique locations (1010 components) - Page 1 of 6

24A Flightway Dunkeswell Honiton EX14 4LG (4 components)

New Build Generating CMU comprising of a battery storage asset

Inactive • 2021-22 (T-4), 2018-19 (T-1)
350 Petre Street Sheffield S4 8LU (16 components)
• New build battery
• New build battery.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Albion Road, Dartford DA1 5PS (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Albion Road, Dartford, Kent, DA1 5PZ (17 components)

battery storage

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Ambulance Station Queen Margaret's Road Scarborough YO11 2YH (2 components)

20 MW Storage facility located at Scarborough.

Inactive • 2021-22 (T-4)
Amersham Road Denham Buckinghamshire SL9 7AW (10 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0BZ (10 components)
• Battery storage
• Gas fired generating units
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Aylesford BES Site Old Church Road Burham Kent ME20 7PA (4 components)

29MW Battery Storage located at Aylesford.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Barnfield Road Swindon SN2 2DJ (3 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Bell Farm Loders Bridport DT6 3SA (2 components)

A 5MW Energy storage system located at Bell Farm, Bridport

Inactive • 2021-22 (T-4)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes DN22 8DB (6 components)

Battery storage

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Bicker Road Donington Spalding PE11 4XR (2 components)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
Boots, DD8 3BS (9 components)
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
• Battery storage and associated infrastructure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Borland Ave, Carlisle CA1 2TL (5 components)

2MW BESS

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Boundary Street, Wigan WN1 3AP (18 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (14 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Carnegie Road, Liverpool, L13 7HY. (6 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Church Farm Solar Farm Slapton Leighton Buzzard Bedfordshire LU7 9BX (4 components)

The CMU consists of a battery energy storage system, physically co-located at the site of, but distinct from an existing solar PV generator.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Commercial Road, Wolverhampton, WV1 3RD (4 components)

battery storage

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Draycott Cross Road Pine View Cheadle ST10 1AB (2 components)

10 MW Storage facility located at Cheadle.

Inactive • 2021-22 (T-4)
Fideoak Mills, Upcott Road, Bishops Hull, Taunton, TA4 1AF (2 components)

The CMU is a 30MW lithium iron battery storage

Inactive • 2021-22 (T-4)
Fields New Road, Chadderton, Oldham OL9 8NT (3 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Former National Cars, Stopgate Lane, Simonswood, Liverpool L33 4YA (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Foyers Power Station, Kelvin Way, Gorthleck, Foyers, Inverness-shire, IV2 6YB (17 components)
• Generating Unit 1
• Generating Unit 2
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
204.51 MW
Loading map...
Showing 25 locations