Brotherton Weir, Knottingley West Yorkshire WF11 8HR (14 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (18 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.05 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (125 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5209.30 MW
Land at Sterte Avenue West, Poole, BH15 2AL (24 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-4) ...
11.01 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (19 components)
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.43 MW
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (9 components)

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
1.07 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (23 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
4.50 MW
Plot B at Severn Road Avonmouth BS10 7SE (16 components)
• 15.000MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
• New Build Battery Energy Storage Systems
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.74 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (15 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
71.09 MW
Russell Farm, Hursley, Winchester SO21 2UZ (15 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (24 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
5.32 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (16 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (29 components)
• 25 MW storage site using Lithium Ion Batteries
• Existing 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
36.89 MW
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (68 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...