Battery

8 unique locations (902 components)

WD7 (72 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
167.93 MW
PR4 (222 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
200.48 MW
NEWLANDS CLOSE EDWALTON NOTTINGHAM NG12 (3 components)
• "Portsmouth Water Funtington, Chinchester, Chinchester, P018 The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that is not used to provide DSR capacity."
• 10 MW Storage facility located at Balby, Doncaster.
• Domestic EV charger
Active • 2025-26 (T-4), 2018-19 (T-1) ...
LE67 (199 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
262.21 MW
KT12 (121 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
52.40 MW
KT10 (103 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
104.05 MW
CW2 (97 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
33.19 MW
CB8 (85 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
138.65 MW
Loading map...
Showing 8 locations