Battery

173 unique locations (1446 components) - Page 2 of 7

SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (9 components)

battery storage

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Sunnydale Farm Smeeton Road Saddington Leicester LE8 0QT (2 components)

A 4.45MW Energy storage system located at Leicester.

Inactive • 2021-22 (T-4)
Sub Station, Percival Lane, Runcorn, Cheschire WA7 4DS (8 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (5 components)

Storage facility

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (16 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.

Active • 2024-25 (T-1), 2023-24 (T-4) ...
2.59 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (24 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
5.32 MW
Severn Way, Berkeley GL13 9TN (4 components)

This CMU is formed of a battery bank and PCS capable of providing 30MW of power. The system is connected via switch gear and a transformer to the distribution network …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)

3MW Battery Storage facility located at Scarborough

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Salford Lodge Pitchill Evesham WR11 8SN (5 components)

0.1MW Tesla battery located at Eversham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Russell Farm, Hursley, Winchester SO21 2UZ (15 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (8 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Rock Farm Ledwych St The Street Ludlow Shropshire SY8 2DS (5 components)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Riverside Way, Barrowford, Lancashire BB9 6DN (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Ripon Street, Attercliffe, Sheffield, S9 3NE (2 components)

The CMU component at the Sheffield Central Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Inactive • 2021-22 (T-4)
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (11 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Inactive • 2023-24 (T-1), 2023-24 (T-4) ...
33.26 MW
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (10 components)

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
48.05 MW
Rainworth Colliery, Rainworth, Mansfield, NG21 0HR (5 components)

battery storage with other generation

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Questmap Business park Drivers Wharf Northam Road Southampton SO14 0PF (5 components)

1.5MW battery located in Southampton

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Queenborough Road, Sheerness ME12 3RL (11 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Q Park, Bath Road, Inchbrook, Stroud, GL5 5HT (3 components)

This CMU is formed of two battery banks and PCS that when combined are capable of providing in excess of 2MW of power. The system is connected via switch gear …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Power House Road Birkenhead Wirral CH62 0AZ (3 components)
• 20MW Gas Reciprocating Engines envisaged to be made up of multiple modules
• 28MW BESS envisaged to be installed in multiple modules operated at 8MW
Inactive • 2021-22 (T-4)
Port of Tilbury, Tilbury, RM18 7EH (5 components)
• New Build Generation CMU, advanced battery energy storage system.
• Site demand offset by onsite behind the meter advanced battery energy storage system.
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (15 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
71.09 MW
Plot B at Severn Road Avonmouth BS10 7SE (16 components)
• 15.000MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
• New Build Battery Energy Storage Systems
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.74 MW
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (3 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity

Inactive • 2022-23 (T-4), 2021-22 (T-4)