Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

64 unique locations (582 components) - Page 3 of 3

Sunnydale Farm Smeeton Road Saddington Leicester LE8 0QT (2 components)

A 4.45MW Energy storage system located at Leicester.

Inactive • 2021-22 (T-4)
The land adjacent to the electricity sub-station off Green Lane Thurcroft S66 9JD (4 components)

50 MW Storage facility located at Thurcroft.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (16 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Trow Green Farm, Trow Green, St Brevials, GL15 6QP (4 components)

The CMU component at Trow Green Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of …

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Twibell Street, Barnsley S71 1JE (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit 10 Ventura Business Park Carterton OX18 1AD (2 components)

A 7MW Energy storage system located at Carterton

Inactive • 2021-22 (T-4)
Unit 2, Sentinel House, Enigma Business Park, WR14 1GL (3 components)

Battery Energy Storage System

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit 3, Wallbridge Industrial Estate, Wallbridge, Stroud, Gloucestershire, GL5 3JU (4 components)

This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (29 components)
• 25 MW storage site using Lithium Ion Batteries
• Existing 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
36.89 MW
Unnamed Road Dunblane FK15 9RD (2 components)

9.999 MW Battery Storage unit located at Dunblane.

Inactive • 2021-22 (T-4)
Valley Park Inverkip Road Greenock PA16 0AH (2 components)

15 MW Storage battery located at Greenock

Inactive • 2021-22 (T-4)
Waters Meeting Road, Bolton, BL1 8HQ (4 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets
Inactive • 2021-22 (T-4)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (68 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 14 locations