Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

109 unique locations (864 components) - Page 1 of 5

Yard (see map) near to 137 Netherton Street, Wishaw, ML2 0EY (5 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (13 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
West Burton Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (5 components)
• West Burton B Power Station CMU 4 [WB4C16] (New build battery storage project)
• West Burton B Power Station CMU 4 [WB4C17] (New build battery storage project)
Inactive • 2020-21 (T-4), 2018-19 (T-1)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (12 components)

10MW battery energy storage facility at Upton Lane, Rownhams

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Trent Basin Nottingham NG2 4DS (5 components)

A 0.5MW Lithium Ion Battery based in Nottingham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Street, Hacheston, IP13 9ND (8 components)

battery storage

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Research Centre, Parc Stormy, Stormydown, Bridgend, CF33 4RS (5 components)

4MW BESS

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (5 components)

0.9MW Battery storage located at Hampshire

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Thelwall Lane, Warrington, WA4 1PD (8 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
The Emirates Stadium, Hornsey Rd, London N7 7AJ (10 components)
• Behind-the-meter battery storage system located at Emirates Stadium in London
• Behind-the-meter battery storage system located at Emirates Stadium in London.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (12 components)

2MW BESS

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (9 components)

battery storage

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Sub Station, Percival Lane, Runcorn, Cheschire WA7 4DS (8 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (5 components)

Storage facility

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)

3MW Battery Storage facility located at Scarborough

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Salford Lodge Pitchill Evesham WR11 8SN (5 components)

0.1MW Tesla battery located at Eversham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (8 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Rock Farm Ledwych St The Street Ludlow Shropshire SY8 2DS (5 components)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (11 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Inactive • 2023-24 (T-1), 2023-24 (T-4) ...
33.26 MW
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (10 components)

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
48.05 MW
Rainworth Colliery, Rainworth, Mansfield, NG21 0HR (5 components)

battery storage with other generation

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Questmap Business park Drivers Wharf Northam Road Southampton SO14 0PF (5 components)

1.5MW battery located in Southampton

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Queenborough Road, Sheerness ME12 3RL (11 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Port of Tilbury, Tilbury, RM18 7EH (5 components)
• New Build Generation CMU, advanced battery energy storage system.
• Site demand offset by onsite behind the meter advanced battery energy storage system.
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Loading map...
Showing 25 locations