Battery Storage

18 unique locations (211 components)

Woodend Farm, Bigrigg, Cumbria, CA22 2TA (13 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
West Burton Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (5 components)
• West Burton B Power Station CMU 4 [WB4C16] (New build battery storage project)
• West Burton B Power Station CMU 4 [WB4C17] (New build battery storage project)
Inactive • 2020-21 (T-4), 2018-19 (T-1)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (12 components)

10MW battery energy storage facility at Upton Lane, Rownhams

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (10 components)

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
48.05 MW
Milton Court Farm, Dorking, RH4 3LY (16 components)
• 5MW battery energy storage facility at Milton Court Farm, Dorking
• 6MW battery energy storage facility at Milton Court Farm, Dorking
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Longcliffe Quarry, B5056, Matlock, Derbyshire DE4 4HN, UK (16 components)
• Battery Storage facility
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Little Holt, Holt Lane, Hook RG27 9ER (11 components)
• 5MW battery energy storage facility at Little Holt, Holt Lane, Hook
• 6MW battery energy storage facility at Little Holt, Holt Lane, Hook
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (19 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (13 components)
• 20 MW of DSR
• 20 MW of demand reduction
• 20MW Battery Storage Facility located in Sudbury, Essex.
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (18 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Hill Farm Spring Lane Packington Ashby de la Zouch Leicestershire LE65 1WU (5 components)
• The 9.8MW CMU component at Hill Farm, Packington is an energy storage system comprised of Lithium-ion batteries.
• The CMU component at Hill Farm, Packington is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 8MW.
Inactive • 2020-21 (T-4), 2018-19 (T-1)
Foyers Power Station, Kelvin Way, Gorthleck, Foyers, Inverness-shire, IV2 6YB (17 components)
• Generating Unit 1
• Generating Unit 2
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
204.51 MW
Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD (10 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD Separate connection
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Carlton,Stockton-On-Tees,TS21 1EA (8 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Carlton,Stockton-On-Tees,TS21 1EA

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (9 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Barnfield Road Swindon SN2 2DJ (3 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Amersham Road Denham Buckinghamshire SL9 7AW (10 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
350 Petre Street Sheffield S4 8LU (16 components)
• New build battery
• New build battery.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 18 locations