Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery Storage

64 unique locations (582 components) - Page 3 of 3

Kilshaw Street Wigan Greater Manchester WN5 8EA (2 components)

20 MW battery storage located at Wigan.

Inactive • 2021-22 (T-4)
Isis House, Howard Road Park North Farm Redditch Worcester B98 7SE (4 components)

10MW battery storage installed at Worcester

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Hill Barton Business Park, Exeter EX5 2HT (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Garboldisham Road Norwich NR16 2EH (2 components)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
Fields New Road, Chadderton, Oldham OL9 8NT (3 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Fideoak Mills, Upcott Road, Bishops Hull, Taunton, TA4 1AF (2 components)

The CMU is a 30MW lithium iron battery storage

Inactive • 2021-22 (T-4)
Draycott Cross Road Pine View Cheadle ST10 1AB (2 components)

10 MW Storage facility located at Cheadle.

Inactive • 2021-22 (T-4)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (125 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5209.30 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (18 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.05 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (14 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Bicker Road Donington Spalding PE11 4XR (2 components)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
Bell Farm Loders Bridport DT6 3SA (2 components)

A 5MW Energy storage system located at Bell Farm, Bridport

Inactive • 2021-22 (T-4)
Barnfield Road Swindon SN2 2DJ (3 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Ambulance Station Queen Margaret's Road Scarborough YO11 2YH (2 components)

20 MW Storage facility located at Scarborough.

Inactive • 2021-22 (T-4)
Loading map...
Showing 14 locations