Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

171 unique locations (1250 components) - Page 4 of 7

Land To The South Of The Limekilns Road Glenrothes Fife KY6 3QH (9 components)

New build battery

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land to the south of the A883 near Bonnybridge FK4 1SN (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land to the Rear of Smartex Showfield Lane Malton YO17 6BT (4 components)

5 MW Battery Storage

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land to the North of Thelwall Lane, Warrington WA4 1LJ (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land to north (see map) of A803 adjacent to SPEN Bonnybridge Depot FK4 1BD (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (11 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land South of Stanlow, Oil Sites Road, Ellesmere Port CH65 4EY (5 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land South of Blackdyke Farm, Todhills, Blackford, CA6 4EZ (5 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land Opposite Chessington Substation Fairoak Lane Chessington KT9 2NS (4 components)

New build battery

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (4 components)

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (8 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
6.38 MW
Land off Shilton Lane & Old Greenock Road by the M898 near Erskine PA7 5NS. See map. (5 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land off Shilton Lane & Old Greenock Road by the M898 near Erskine PA7 5NS (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. This CMU is adjacent …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land Off, Meaford Road, Barlaston, Stoke On Trent, ST15 8UX (4 components)

New build energy storage facility

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land off Mansfield Road, Hawick, TD9 8AR (2 components)

Battery storage and associated infrastructure

Inactive • 2021-22 (T-4)
Land off Glencryan Road, on Carbrain Industrial Estate, Cumbernauld, G67 2UH (4 components)

The facility consists of a lithium ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN's network at 33kV.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land off Ash Road, Elton, Chester CH2 4LB (13 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land north of Hinkley Road LE10 3EG (3 components)

5 MW lithium battery located at Hinkley.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land North of Clayhill Farm Westoning MK45 5JD (7 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land North of Bumpers Farm, Bumpers Lane, Ilmer HP27 9RE (2 components)

5 MW of Battery Storage located at Ilmer.

Inactive • 2021-22 (T-4)
Land East of Alders Way, Yalberton Industrial Estate, Paignton, Devon TQ4 7QL (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations