Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Battery

171 unique locations (1250 components) - Page 6 of 7

Kirkthorpe Weir Kirkthorpe Wakefield West Yorkshire WF1 5SY (4 components)

The CMU component at Kirkthorpe is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Kilshaw Street Wigan Greater Manchester WN5 8EA (2 components)

20 MW battery storage located at Wigan.

Inactive • 2021-22 (T-4)
J3 Business Park Balby Carr End Doncaster DN4 8DE (6 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Isis House, Howard Road Park North Farm Redditch Worcester B98 7SE (3 components)

10MW battery storage installed at Worcester

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Hill Hall Solar Farm, Little Bardfield, Braintree, Essex, CM7 4SH (4 components)

The CMU consists of a battery energy storage system, physically co-located at the site of, but distinct from an existing solar PV generator.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Hill Farm Spring Lane Packington Ashby de la Zouch Leicestershire LE65 1WU (4 components)
• The 9.8MW CMU component at Hill Farm, Packington is an energy storage system comprised of Lithium-ion batteries.
• The CMU component at Hill Farm, Packington is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 8MW.
Inactive • 2020-21 (T-4), 2018-19 (T-1)
Hill Barton Business Park, Exeter EX5 2HT (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Greengill Head Farm, Maidenhill Road Penrith Cumbria CA11 8SH (4 components)

Stagstone Energy Centre is an 8MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Grand Union Farm Rising Lane Baddesley Clinton SOLIHULL B93 0FJ (3 components)

CMU consists of Stationary Lithium ion Battery with ability to export or import 10MW via grid site connection

Inactive • 2018-19 (T-1)
Gothic Cottage Farm Mill Rd East Ruston Norwich NR12 9HS (4 components)

A 0.18 MW Storage facility located in Norwich

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Gaywood Farm Hilders Lane Edenbridge TN8 6LD (5 components)

7.5MW Lithium Ion Battery Technology

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Garstons Track, Winchester SO21 2BJ, UK (4 components)

This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to …

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Garboldisham Road Norwich NR16 2EH (2 components)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
Foyers Power Station, Kelvin Way, Gorthleck, Foyers, Inverness-shire, IV2 6YB (15 components)
• Generating Unit 1
• Generating Unit 2
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
204.51 MW
Former National Cars, Stopgate Lane, Simonswood, Liverpool L33 4YA (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Fields New Road, Chadderton, Oldham OL9 8NT (3 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Fideoak Mills, Upcott Road, Bishops Hull, Taunton, TA4 1AF (2 components)

The CMU is a 30MW lithium iron battery storage

Inactive • 2021-22 (T-4)
Draycott Cross Road Pine View Cheadle ST10 1AB (2 components)

10 MW Storage facility located at Cheadle.

Inactive • 2021-22 (T-4)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (113 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5209.30 MW
Commercial Road, Wolverhampton, WV1 3RD (4 components)

battery storage

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (16 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.05 MW
Loading map...
Showing 25 locations