CHP and autogeneration

29 unique locations (166 components) - Page 1 of 2

Active MW: 12971.49 MW
Inactive MW: 157.64 MW
1345 Govan Rd., Glasgow, G51 4TF (4 components)

CHPs at Queen Elizabeth Hospital (3)

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU NHS Glasgow G51
Active • 2024-25 (T-1), 2023-24 (T-1) ...
4.32 MW
4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA (2 components)

New CHP engine to be installed at 4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA (2)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX142 G32
Active • 2025-26 (T-4), 2022-23 (T-1)
530 London Road, Croydon, CR7 7YE (4 components)

Gas fired CHP unit (3)

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG69 CR7
Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.82 MW
Dalmarnock, 120 Cotton Street, Glasgow, G40 4HU (3 components)

CHP at a water treatment works in Glasgow. (3)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX147 FLEX147 G40
Active • 2025-26 (T-4), 2024-25 (T-1) ...
0.92 MW
Darent Valley Hospital, Darenth Wood Rd, Dartford, DA2 8DA (3 components)

1280 KWe Combined Heat and Power unit. (3)

Active • 2024-25 (T-1), 2022-23 (T-1) ...
1.15 MW
Energy Centre, Lower Mosley Street, Manchester M2 3GX (4 components)

A 3.36MW gas fired reciprocating engine CHP. (3)

Combined Heat and Power (CHP) VITAL ENERGI SOLUTIONS LIMITED New Build Generating CMU CQH CQH +1 more M2
Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.99 MW
Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (4 components)
• VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (2)
• VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
Combined Heat and Power (CHP) VITAL ENERGI SOLUTIONS LIMITED New Build Generating CMU COV COV +1 more CV2
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.01 MW
Engie Great Coates, Grimsby, DN31 2TT (15 components)

Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the … (3)

Combined Heat and Power (CHP) BRING ENERGY LIMITED Existing Generating CMU Humber Humber +2 more DN31
Active • 2024-25 (T-1), 2023-24 (T-1) ...
6.14 MW
Engie Great Coates, Grimsby, DN31 2TT (10 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks (2)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Combined Heat and Power (CHP) BRING ENERGY LIMITED Existing Generating CMU Humber Humber +2 more DN31
Active • 2024-25 (T-1), 2023-24 (T-1) ...
4.09 MW
HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE (2 components)

CHP engines to be installed at: HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE (2)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX140 L24
Active • 2025-26 (T-4), 2022-23 (T-1)
Haxby Rd, York, YO91 1XY (9 components)
• CHP Unit (2)
• Gas fired CHP unit
CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG77 Nestle +2 more Rejected YO91
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
HUMBERSTONE ROAD, GRIMSBY, DN32 8HW (2 components)

CHP engines to be installed at HUMBERSTONE ROAD, GRIMSBY, DN32 8HW (2)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX142 DN32
Active • 2025-26 (T-4), 2022-23 (T-1)
JDE, Ruscote Avenue, Banbury, Oxfordshire, OX16 2QU (16 components)
• Centrax gas turbine CHP (2)
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU20 GCMU20 +3 more OX16
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
LADYSMITH ROAD, GRIMSBY, DN32 9EE (2 components)

CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE (2)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX141 DN32
Active • 2025-26 (T-4), 2022-23 (T-1)
Lancaster University, Bailrigg, Lancaster, LA1 4YW (4 components)

Gas fired CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX41 GENX41 +1 more LA1
Active • 2024-25 (T-4), 2023-24 (T-1) ...
1.66 MW
London Rd, Purfleet RM19 1SD (11 components)

Gas-fired CHP unit (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
Moorcroft Drive Wednesbury WS10 7DE (2 components)

EnerG 1000 CHP (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.91 MW
Newton Aycliffe CO Durham DL5 6EA (12 components)

This is an existing CHP (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
14.61 MW
Port Causeway Bromborough Merseyside CH62 4TH (10 components)

Turbomach M50 Natural Gas fired CHP unit (3)

CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU06 GCMU06 +4 more CH62
Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.03 MW
Repton Road, Measham, Swadlincote, DE12 7DT (9 components)

Gas fired CHP unit (3)

CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Base Power KPEG73 DE12
Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.32 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (10 components)

Turbomach M50 Natural Gas fired CHP unit (3)

CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU07 GCMU07 +4 more BA14
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.80 MW
Stoneykirk Road, Stranraer, DG9 7BU (9 components)

Gas fired CHP unit (3)

CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Base Power KPEG72 DG9
Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.38 MW
UK WINDOWS & DOORS GROUP LIMITED, 6400 Severn Drive, Tewkesbury, GL20 8SF. (2 components)

Cummins HSK78 2,000 kW Gas Engine located at UK WINDOWS & DOORS GROUP LIMITED, 6400 Severn Drive, Tewkesbury, GL20 8SF. (2)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ12 GL20
Inactive • 2023-24 (T-1), 2022-23 (T-1)
1.63 MW
Unit 2898 Tuscany Park Wakefield WF6 2TZ (2 components)

EnerG 1000 CHP (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.91 MW