The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (15 components)

Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (10 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.82 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (22 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.60 MW
Station Road, Wigton, Cumbria CA7 9BG (37 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2024-25 (T-4), 2024-25 (T-1) ...
22.35 MW
Seal Sands, Middlesbrough, TS2 1UB (20 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seal Sands, Middlesborough, TS2 1UB (20 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Sallow Rd, Weldon Ind Est, Corby Northants, NN17 5JX (9 components)

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network.

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (10 components)

Two gas CHP in a horticultural environment with no aux load

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (14 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.73 MW
Priory Street, Ware, Hertfordshire, SG12 0DJ (13 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Port Causeway Bromborough Merseyside CH62 4TH (21 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.07 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (13 components)

CHP engine in a horticultural environment, natural gas, no aux load

Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.82 MW
Plot 5, Barrow Man Road, Birchington Kent CT7 0AX (8 components)

One CHP engine in a horticultural environment with no auxilliary load.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.97 MW
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (7 components)

Two CHP gas engines in commercial horticultural environment with no auxilliary load

Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.96 MW
Plot 3, Barrow Man Road, Birchington CT7 0AX (13 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
37.42 MW
Park Road, Ware. Hertfordshire, SG12 0DP (25 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ottringham Road Keyingham Hull North Humberside HU12 9RX (8 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
North Lonsdale Road, Cumbria, Ulverston, LA12 9DR (16 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Melrow Nursery, Rydings Lane, Southport PR9 8EB (15 components)

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Marsh Road, Banks, Southport PR9 8DX (19 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (21 components)
• The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 5.535MW and additional PSEUDO MPAN's are fitted.
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
London Rd, Purfleet RM19 1SD (22 components)

Gas-fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
14.61 MW
Lhoist UK Ltd Hindlow Buxton SK17 0EL (16 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (47 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.96 MW