Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

13 unique locations (357 components)

1 Thane Road West, Nottingham, NG2 3AA (73 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
21.44 MW
Church Manorway, Erith DA8 1DL (47 components)

gas-fired CHP unit

Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.03 MW
Drakemyre, Dalry KA24 5JJ (24 components)

Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (3)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
12.45 MW
Galley Hill Road Waltham Abbey Essex EN9 2AG (16 components)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.50 MW
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (8 components)
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.07 MW
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (47 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.96 MW
London Rd, Purfleet RM19 1SD (22 components)

Gas-fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
14.61 MW
Port Causeway Bromborough Merseyside CH62 4TH (21 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.07 MW
Repton Road, Measham, Swadlincote, DE12 7DT (13 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
Station Road, Wigton, Cumbria CA7 9BG (37 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2024-25 (T-4), 2024-25 (T-1) ...
22.35 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (22 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.60 MW
Stoneykirk Road, Stranraer, DG9 7BU (16 components)
• CHP unit
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
3.58 MW
Loading map...
Showing 13 locations