CHP and autogeneration

69 unique locations (1379 components) - Page 1 of 3

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.08 MW
41.84 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (37 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2921.10 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (14 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.91 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (12 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2.72 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (15 components)

Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (31 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.94 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (10 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.82 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (26 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.17 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (17 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.21 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (22 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.60 MW
Station Road, Wigton, Cumbria CA7 9BG (37 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2024-25 (T-4), 2024-25 (T-1) ...
22.35 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (14 components)
• 8.300MW Gas Turbine installation
• 8.3MW Gas Turbine installation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S21G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.65 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (23 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• S23G03 will be a OCGT in CHP Configuration within the (former ICI) Wilton Site. CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.48 MW
School Road, Aberdeen AB24 1TU (18 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.73 MW
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (11 components)
• Gas CHP in horticultural environment providing heat & electricity for crop growth
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.04 MW
Saltend Power Station Saltend Hull HU12 8GA (36 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19398.68 MW
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (10 components)

Two gas CHP in a horticultural environment with no aux load

Active • 2025-26 (T-4), 2024-25 (T-4) ...
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (16 components)

Energy from Waste Recovery Facility (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1058.68 MW
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (14 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.73 MW
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (13 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity of 5.050 MW.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.300 MW and a net power capacity of 5.109 MW after taking into account generator auxiliary load.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity of 5.290 MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.78 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1118.24 MW
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (11 components)
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 25 locations