CHP and autogeneration

37 unique locations (206 components) - Page 1 of 2

Active MW: 35388.22 MW
Inactive MW: 1729.46 MW
Young's House, Wickham Road, Grimsby DN32 8HW (4 components)
• On-site Generating CMU (2)
• on site generating CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.22 MW
University of East Anglia, Norwich Research Park, Norwich NR4 7TJ (8 components)

Behind the Meter CHP Unit

Active • 2025-26 (T-1), 2024-25 (T-1) ...
10.90 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (6 components)
• On-Site Generating CMU. (2)
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
79.47 MW
The Heat Station, Harbour Parade, Southampton, Hampshire, SO15 1BA (24 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
9.91 MW
St Marks Boilerhouse, Donaldson Road, LEICESTER, Leicestershire LE4 6BF (13 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.10 MW
Staverton, Trowbridge, BA14 6PG (1 component)

Turbomach M50 Natural Gas fired CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU07 BA14
Active • 2025-26 (T-1)
4.47 MW
Speke Blvd, Speke, Liverpool L24 9LE (3 components)
• on site generating CMU (2)
• On-site Generating CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.61 MW
3.27 MW
Northmoor Lane, Cottingham, Hull HU16 4JN (6 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load

Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.67 MW
Newark Factory, Newark, Nottinghamshire NG24 1DL (1 component)

Behind the Meter CHP Unit

Active • 2025-26 (T-1)
11.37 MW
Morrisons Farmers Boy, Cemetery Road, Greenside Park, Bradford BD8 9RU (4 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2026-27 (T-1) ...
5.32 MW
Little Horton Lane, Bradford West Yorkshire, BD5 0NA (1 component)

Behind the Meter CHP Unit

Active • 2025-26 (T-1)
0.28 MW
Leeds Rd, Huddersfield HD2 1FG (2 components)
• Behind the Meter CHP Unit
• Syngenta - CHP unit
Active • 2025-26 (T-1), 2024-25 (T-1)
11.41 MW
Holborough House, 32 Lismore Boulevard. London NW9 4DX (2 components)

Combined heat and power facility attached to district heat network.

Active • 2026-27 (T-1), 2025-26 (T-1)
2.91 MW
High Street, Waterham, nr Faversham, Kent ME13 9EJ (11 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Two of six CHP engines horticultural environment with no auxiliiary load
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX01 FLEX01 +3 more ME13
Active • 2027-28 (T-4), 2026-27 (T-1) ...
31.97 MW
Great Coates, Grimsby, DN31 2TT (15 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Active • 2029-30 (T-4), 2026-27 (T-1) ...
13.65 MW
Great Coates, Grimsby, DN31 2TT (15 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 4.721 MW as per the average of 3 nominated export peaks
Active • 2029-30 (T-4), 2026-27 (T-1) ...
13.65 MW
Energy Centre, Ashton Street, Liverpool, L69 3GB (2 components)

One of the three CHP units at Energy Centre, Ashton Street, Liverpool, L69 3GB

Active • 2025-26 (T-4), 2025-26 (T-1)
2.24 MW
Energy Centre, Ashton Street, L69 3GB (4 components)

One of three CHP units at Energy Centre, Ashton Street, L69 3GB

Active • 2025-26 (T-4), 2025-26 (T-1)
4.49 MW
Downs Rd, Sutton SM2 5PT (3 components)
• Behind the Meter CHP
• Emergency Behind the Meter Diesel Generator
Active • 2025-26 (T-4), 2025-26 (T-1)
1.87 MW
Donaldsons Nursery, Vinnetrow Road, Runcton, Chichester PO20 1QD (3 components)

Existing Generating CHP

Active • 2029-30 (T-4), 2026-27 (T-1) ...
4.18 MW
Denmark Hill, Brixton, London, SE5 9RS (8 components)
• Behind the Meter CHP Unit
• CHP unit
• Gas fired CHP unit
Active • 2025-26 (T-1), 2023-24 (T-4) ...
3.86 MW
CORPORATION ROAD, NEWPORT, NP19 4XF (2 components)

Gas fired CHP at Corporation Road

Active • 2025-26 (T-1), 2024-25 (T-1)
6.71 MW
Loading map...
Showing 25 locations