Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

114 unique locations (948 components) - Page 1 of 5

Active MW: 12971.49 MW
Inactive MW: 157.64 MW
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (2 components)

New-Build CHP Generating Unit at Berry Wicks Farm. (2)

Active • 2028-29 (T-4), 2025-26 (T-4)
1.26 MW
Westexe, Tiverton, Devon, EX16 5LL (6 components)

2026 kW CHP unit (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.65 MW
Valley Park Industrial Estate, Meadow Gate, Wombwell, Barnsley, S73 0UN (1 component)

Generating unit

Active • 2025-26 (T-4)
University of Warwick, Coventry, CV4 7AL (48 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL (2)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GC2426 GCMU18 +4 more CV4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (9 components)
• Gas fired CHP unit (2)
• Gas CHP in St. Austell
Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG55 Rejected PL26
Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.12 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (10 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (3)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (19 components)
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe (2)
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
DSR Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU XGEN24 XGEN24 +6 more E16
Active • 2025-26 (T-4), 2023-24 (T-1) ...
13.16 MW
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (5 components)

1.280MW CHP (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.34 MW
The Ridgeway Enfield, Middlesex EN2 8JL (8 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980 (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GBD010 Rejected EN2
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.03 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (11 components)

Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (14 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks (2)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Christie Hospital, Wilmslow Road, Manchester, M20 4BX (1 component)

VIT43A - CHP unit at The Christie Hospital, Wilmslow Road, Manchester, M20 4BX

Active • 2025-26 (T-4)
Thearne Lane, Woodmansey, Beverley, North Humberside, HU17 0SA (3 components)

2 x CHP at a horticultural site (3)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX167 HU17
Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.33 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Two gas CHP engines in commercial horticultural environment with no auxilliary load (2)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX14 FLEX14 +2 more HU17
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (10 components)

CHP engine in horticultural environment with no auxilliary load (3)

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX02 FLEX02 +2 more CT7
Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.82 MW
Telford Dairy Limited, Donnington Wood Business Park, Telford, Shropshire, TF2 7GJ (4 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
3.83 MW
Taw Valley Creamery, South Weeke, North Tawton, Devon, England, EX20 2DA (4 components)

CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ02 GENZ02 +1 more EX20
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1.76 MW
Syensqo Oldbury, Trinity St, Oldbury, B69 4LN (1 component)

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GBD048 / GB2548 B69
Active • 2025-26 (T-4)
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)

Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.89 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (9 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.75 MW
Station Road, Wigton, Cumbria CA7 9BG (20 components)
• Gas engine (2)
• Gas turbine
OCGT CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU16 GCMU16 +10 more CA7
Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.23 MW
Staithes Road, Preston, East Riding of Yorkshire HU12 8TB (2 components)

On-Site Generating CMU.

Active • 2025-26 (T-1), 2025-26 (T-4)
1.97 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (10 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
19.72 MW
Solenis, Cleckheaton Road, Low Moor, Bradford, United Kingdom, BD12 0JZ (11 components)

Gas Turbine CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX42 GENX42 +2 more BD12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.17 MW
Loading map...
Showing 25 locations