CHP and autogeneration

4 unique locations (162 components)

EDF Energy, Heysham 2 power station, Morecambe, Lancashire, LA3 2XH (43 components)
• Heysham 2 Power Station CMU 7: [HY2723] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 7: [HY2724] T_HEYM27 + (50% x T_HEYM2-D)
• Heysham 2 Power Station CMU 8: [HY2824] T_HEYM28 + (50% x T_HEYM2-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3985.39 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (32 components)
• 49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3881.97 MW
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 5 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (22 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.93 MW
Loading map...