Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.08 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (19 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• One 2MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.18 MW
41.84 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (37 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2921.10 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (14 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.91 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (26 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.17 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (17 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.21 MW
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (10 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 MW.
• 2*2 gas reciprocating engines with a total gross power capacity of 4.00 MW and a net power capacity of 3.960 MW.
• 2X gas reciprocating engines with a total gross power capacity of 3.973 MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.59 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (14 components)
• 8.300MW Gas Turbine installation
• 8.3MW Gas Turbine installation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S21G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.65 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (23 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• S23G03 will be a OCGT in CHP Configuration within the (former ICI) Wilton Site. CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.48 MW
School Road, Aberdeen AB24 1TU (18 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.73 MW
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (11 components)
• Gas CHP in horticultural environment providing heat & electricity for crop growth
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.04 MW
Saltend Power Station Saltend Hull HU12 8GA (36 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19398.68 MW
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (16 components)

Energy from Waste Recovery Facility (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1058.68 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1118.24 MW
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (11 components)
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Power Station Road Isle of Grain Rochester ME3 0AR (60 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1271.89 MW
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (19 components)
• CHP at a horticultural environment.
• CHP at horticultural site
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.62 MW
Newton Aycliffe CO Durham DL5 6EA (38 components)
• This is a long standing existing CHP unit located on land within a manufacturing site.
• This is an existing CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.22 MW
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (17 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602 (2)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.53 MW
Montgomery Road, Aberdeen AB24 2YA (18 components)

District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.54 MW
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (17 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
• One asset 2.0MW CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.81 MW
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (22 components)

Combined Heat and Power Plant Olympic Park London

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.56 MW