100 Montifichet Road, Westfield, Stratford E20 1GR (72 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …

Active • 2024-25 (T-4), 2025-26 (T-1) ...
52.51 MW
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (2 components)

2 x gas fired CHP generators located at a horticultural site.

Active • 2024-25 (T-4), 2028-29 (T-4)
5.48 MW
2 Samworth Way, Melton Mowbray LE13 1GA (13 components)

Existing Generation on existing site - CHP

Active • 2023-24 (T-1), 2024-25 (T-1) ...
13.34 MW
47-53 Charterhouse Street, London, EC1M 6PB (31 components)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• A site with two reciprocating gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
28.03 MW
96 Kings Rd, Immingham DN40 1QS (2 components)

New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.

Active • 2028-29 (T-4)
6.45 MW
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (12 components)
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Active • 2023-24 (T-4), 2024-25 (T-4) ...
1.20 MW
2.28 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (27 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
18.47 MW
Ashgrove Road West, Aberdeen AB16 5UL (26 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
4.54 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (13 components)

Existing Generation on existing site - CHP

Active • 2023-24 (T-1), 2024-25 (T-1) ...
10.41 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (57 components)
• !MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2024-25 (T-4), 2025-26 (T-1) ...
14.83 MW
Barrier Park CHP, North Woolwich Road, Silvertown, London, E16 2HP (14 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2023-24 (T-4), 2025-26 (T-4) ...
0.70 MW
Barrow Man Road Birchington Kent CT7 0AX (14 components)
• Two CHP engines in horticultural environment with no auxilliary load
• Two 2.7MW CHP engines. Primary fuel type = Natural Gas
Active • 2022-23 (T-4), 2023-24 (T-4) ...
9.46 MW
Bath CHP, Midland Road, Bath, BA2 3EW (14 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2023-24 (T-4), 2025-26 (T-4) ...
0.72 MW
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH (18 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

Active • 2024-25 (T-1), 2025-26 (T-1) ...
28.63 MW
Beach Esplanade, Aberdeen AB24 5NR (15 components)

District heating implementation with one asset 1MW and no auxiliary load

Active • 2024-25 (T-4), 2025-26 (T-4) ...
7.09 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (4 components)

2025 KW gas fire engine

Active • 2024-25 (T-1), 2025-26 (T-1) ...
9.25 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (3 components)

2025kW gas engine

Active • 2024-25 (T-1), 2025-26 (T-1) ...
5.54 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (47 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2024-25 (T-1), 2025-26 (T-1) ...
178.50 MW
267.94 MW
Caernarfon Brick Works, Seiont Mill Road, Caernarfon, LL55 2YL (3 components)

New-Build CHP Generating Unit at Seoint Quarry, Caernarfon.

Active • 2028-29 (T-4)
36.38 MW
Cargill PLC, Trafford Park, M17 1PA (30 components)

Siemens SGT200 Based CHP

Active • 2022-23 (T-3), 2022-23 (T-4) ...
94.67 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (80 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2022-23 (T-4), 2023-24 (T-4) ...
93.80 MW
27.40 MW
Cashmere Works, Birksland Street, Bradford, West Yorkshire, BD3 9SX (6 components)

On-Site Generating CMU

Active • 2024-25 (T-1), 2025-26 (T-1) ...
5.39 MW