Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

39 unique locations (704 components) - Page 1 of 2

Westexe, Tiverton, Devon, EX16 5LL (11 components)

2026 kW CHP unit

Active • 2021-22 (T-4), 2022-23 (T-1) ...
7.31 MW
7.18 MW
3.64 MW
Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB (9 components)
• 2 x On-site turbo alternators
• 6 x On-site turbo alternators
• Power Recovery Train
Inactive • 2019-20 (T-1)
6.35 MW
Shewalton Road, Irvine, West Sussex, KA11 5AP (10 components)

CHP and autogeneration

Inactive • 2019-20 (T-1), 2022-23 (T-4)
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (23 components)
• Power Station for Paper plant made up of 1x35MW Gas engine
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
Active • 2022-23 (T-4), 2023-24 (T-4) ...
41.29 MW
North Avenue, Marston Green, Birmingham, B40 1NT (26 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
Active • 2021-22 (T-1), 2022-23 (T-3) ...
5.83 MW
Moorcroft Drive Wednesbury WS10 7DE (13 components)

EnerG 1000 CHP

Active • 2021-22 (T-4), 2022-23 (T-1) ...
6.35 MW
Harmire Road, Barnard Castle, County Durham, DL12 8D (15 components)

On-site existing CHP generating unit

Active • 2021-22 (T-1), 2021-22 (T-4) ...
6.35 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (79 components)
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G2 6,8 MWe
• TLOR-1 1 ea 38MWe Cogeneration Unit 9G1
Inactive • 2020-21 (T-4), 2021-22 (T-4) ...
7.28 MW
Denison Road, Selby, North Yorkshire YO8 8AN (24 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2021-22 (T-4), 2022-23 (T-3) ...
7.51 MW
Denison road, Selby, North Yorkshire, YO8 8AN. (14 components)

Gas Turbine Cogeneration Unit GT3

Active • 2022-23 (T-1), 2023-24 (T-1) ...
65.83 MW
Loading map...
Showing 25 locations