Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

51 unique locations (278 components) - Page 1 of 3

Active MW: 12971.49 MW
Inactive MW: 157.64 MW
Young's House, Wickham Road, Grimsby DN32 8HW (4 components)
• On-site Generating CMU (2)
• on site generating CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.22 MW
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (2 components)

New-Build CHP Generating Unit at Berry Wicks Farm. (2)

Active • 2028-29 (T-4), 2025-26 (T-4)
1.26 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
36.30 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (11 components)

Warrington Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.17 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (6 components)
• On-Site Generating CMU. (2)
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
79.47 MW
The Ridgeway Enfield, Middlesex EN2 8JL (8 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980 (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GBD010 Rejected EN2
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.03 MW
The Ridgeway Enfield, Middlesex EN2 8JL (2 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980 (2)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected EN2
Inactive • 2021-22 (T-1), 2020-21 (T-1)
Telford Dairy Limited, Donnington Wood Business Park, Telford, Shropshire, TF2 7GJ (4 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
3.83 MW
Syensqo Oldbury, Trinity St, Oldbury, B69 4LN (1 component)

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GBD048 / GB2548 B69
Active • 2025-26 (T-4)
Staithes Road, Preston, Hull, HU12 8TB (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.49 MW
Staithes Road, Preston, East Riding of Yorkshire HU12 8TB (2 components)

On-Site Generating CMU.

Active • 2025-26 (T-1), 2025-26 (T-4)
1.97 MW
Speke Blvd, Speke, Liverpool L24 9LE (3 components)
• on site generating CMU (2)
• On-site Generating CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.61 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (10 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
19.72 MW
Solvay, Trinity St, Oldbury, B69 4LW (6 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected B69
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.46 MW
Snodland Paper Mill, Mill Street, Snodland, Kent, ME6 5AX (3 components)

On-site Generating CMU. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
28.42 MW
Sapphire Mill, Glenwood Rd, Leslie, Glenrothes KY6 3AB (1 component)

Existing Generating CMU/

Active • 2025-26 (T-4)
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (11 components)

Callington - Existing Site CHP unit (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.27 MW
Repton Rd (Adjacent to Plastic Omnium Site), Measham DE12 7DT (2 components)

On-Site Generating CMU.

Active • 2025-26 (T-1), 2025-26 (T-4)
1.89 MW
Queensway Campus Hortonwood, Queensway, Hadley, Telford TF1 7FS (2 components)

On site generating CMU (2)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected TF1
Active • 2027-28 (T-4), 2024-25 (T-1)
3.59 MW
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS (11 components)

Poole Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
Pond Street London NW3 2QG (8 components)

On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GBD010 Rejected NW3
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.13 MW
Pond Street London NW3 2QG (2 components)

On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG (2)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected NW3
Inactive • 2021-22 (T-1), 2020-21 (T-1)
Pembroke Rd, Merlin's Bridge, Haverfordwest SA61 1JN (6 components)

Existing Generation on existing site - CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.67 MW
Nufarm Wyke Lane, Wyke, Bradford, West Yorkshire, BD12 9EJ (3 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
11.21 MW
Muller UK Limited, Tern Valley Business Park, Market Drayton, Shropshire, TF9 3SQ (4 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
12.31 MW
Loading map...
Showing 25 locations