Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

50 unique locations (371 components) - Page 1 of 2

Active MW: 0.00 MW
Inactive MW: 0.00 MW
2 Samworth Way, Melton Mowbray LE13 1GA (7 components)

Existing Generation on existing site - CHP

Active • 2029-30, 2028-29 ...
9.34 MW
5 Coulman St, Thorne, Doncaster DN8 5JT (3 components)
• On-Site Generating CMU
• new build on site generating CMU
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU On-Site Energy - Chesterfield Poultry DN8
Active • 2027-28, 2026-27 ...
2.75 MW
96 Kings Rd, Immingham DN40 1QS (3 components)
• Existing Generating CHP
• New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU GB2502 DN40
Active • 2028-29 (T-4), 2026-27 (T-1) ...
6.77 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (8 components)

Existing Generation on existing site - CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
7.71 MW
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (6 components)

on site generating CMU

Active • 2029-30 (T-4), 2027-28 (T-4) ...
8.97 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
DSR Combined Heat and Power (CHP) GRIDBEYOND LIMITED Proven DSR CMU Endeco Technologies CMU1 DN16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
42.08 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (24 components)
• existing CHP on site.
• existing on site CHP
• existing onsite CHP
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected DN16
Active • 2027-28 (T-4), 2026-27 (T-4) ...
149.20 MW
Caernarfon Brick Works, Seiont Mill Road, Caernarfon, LL55 2YL (1 component)

New-Build CHP Generating Unit at Seoint Quarry, Caernarfon.

Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU Not Prequalified LL55
Active • 2028-29 (T-4)
18.19 MW
Cashmere Works, Birksland Street, Bradford, West Yorkshire, BD3 9SX (5 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.75 MW
Chryston, Moodiesburn, Glasgow G69 0JE (5 components)

On-site Generating CMU.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
8.19 MW
Clay Wheels Ln, Wadsley Bridge S6 1LY (3 components)
• On-Site Generating CMU
• new build on site generating CMU
Active • 2027-28 (T-4), 2026-27 (T-1) ...
3.69 MW
Clough Green, Cawthorne, Barnsley, S75 4AD (5 components)

On-site Generating CMU.

Active • 2029-30 (T-4), 2026-27 (T-1) ...
3.76 MW
Donaldsons Nursery, Vinnetrow Road, Runcton, Chichester PO20 1QD (3 components)

Existing Generating CHP

Active • 2029-30 (T-4), 2026-27 (T-1) ...
4.18 MW
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (12 components)

Hamms Hall - Existing Site CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
7.30 MW
Hugden Way, Malton YO17 9HG (6 components)
• On-site Generating Unit.
• on site generating cmu
Active • 2029-30 (T-4), 2028-29 (T-4) ...
13.30 MW
Innospec Manufacturing Park, Oil Sites Road Ellesmere Port, Cheshire CH65 4EY (4 components)

On-site Generating CMU.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
11.20 MW
Lake Rd, Trafford Park, Stretford, Manchester M17 1TU, United Kingdom (6 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
10.42 MW
Lindum Mill, Ashby Road, Shepshed, Leicestershire, LE12 9BS (5 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
5.46 MW
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (16 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GridBeyond GBD009 LL14
Active • 2029-30 (T-4), 2028-29 (T-4) ...
168.87 MW
13.20 MW
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (12 components)

Nantwich Existing Site CHP

Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.05 MW
Morrisons Farmers Boy, Cemetery Road, Greenside Park, Bradford BD8 9RU (4 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2026-27 (T-1) ...
5.32 MW
Muller Milk and Ingredients Market Way, North Petherton, Bridgwater, TA6 6DF (6 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
12.65 MW
Muller Milk & Ingredients Ltd, Stonebridge Cross, Hampton Lovett, Droitwich, WR9 0NX (6 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
20.89 MW
Muller UK Limited, Tern Valley Business Park, Market Drayton, Shropshire, TF9 3SQ (6 components)

On-Site Generating CMU

Active • 2029-30 (T-4), 2028-29 (T-4) ...
20.48 MW
Loading map...
Showing 25 locations