Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

72 unique locations (1467 components) - Page 1 of 3

100 Montifichet Road, Westfield, Stratford E20 1GR (44 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.62 MW
1 Thane Road West, Nottingham, NG2 3AA (73 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
21.44 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (10 components)
• District heating implementation of two gas CHP engines with no auxilliary load
• Two 3.0 MW gas CHP engines. Primary fuel type = Natural Gas
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.48 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (12 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.25 MW
47-53 Charterhouse Street, London, EC1M 6PB (21 components)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• A site with two reciprocating gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.66 MW
9 Handyside St, Kings Cross, London N1C 4BH (12 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2025-26 (T-4) ...
3.52 MW
Ashgrove Road West, Aberdeen AB16 5UL (18 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.92 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (34 components)
• !MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.61 MW
Barrow Man Road Birchington Kent CT7 0AX (10 components)
• Two CHP engines in horticultural environment with no auxilliary load
• Two 2.7MW CHP engines. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.73 MW
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (14 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS

Active • 2027-28 (T-4), 2026-27 (T-4) ...
130.06 MW
Broadgreen Hospital, Thomas Drive, Liverpool L14 3LB (15 components)
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity of 1.949 MW
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.185 MW and a net power capacity of 2.166 MW after taking into account generator auxiliary load.
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.185 MW and total net power capacity of 2.155 MW
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.75 MW
55.34 MW
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (28 components)
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
15.32 MW
Cargill PLC, Trafford Park, M17 1PA (20 components)

Siemens SGT200 Based CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.35 MW
Church Manorway, Erith DA8 1DL (47 components)

gas-fired CHP unit

Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.03 MW
Cobden Street, Montrose, Angus, DD10 8EA (12 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Denison Road, Selby, North Yorkshire YO8 8AN (18 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.51 MW
Drakemyre, Dalry KA24 5JJ (24 components)

Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (3)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
12.45 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (49 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (21 components)
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component BREH01 consists of one CHP engine supplying heat, CO2 and power to the on site Nursery.
• The CMU component BREH02 consists of one CHP engine supplying heat, CO2 and power to the on-site Nursery.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
41.65 MW
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (30 components)
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW (2)
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
57.65 MW
Galley Hill Road Waltham Abbey Essex EN9 2AG (16 components)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.50 MW
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (22 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (20 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations