Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

279 unique locations (2237 components) - Page 1 of 12

Active MW: 12971.49 MW
Inactive MW: 157.64 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (10 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active • 2025-26 (T-1), 2024-25 (T-1) ...
10.97 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (20 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.97 MW
1345 Govan Rd., Glasgow, G51 4TF (4 components)

CHPs at Queen Elizabeth Hospital (3)

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU NHS Glasgow G51
Active • 2024-25 (T-1), 2023-24 (T-1) ...
4.32 MW
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (4 components)

2 x gas fired CHP generators located at a horticultural site. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
5.46 MW
1 Thane Road West, Nottingham, NG2 3AA (36 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
23.32 MW
203 Fulham Rd, London SW3 6JJ (1 component)

Behind the Meter CHP Unit

Active • 2025-26 (T-1)
0.91 MW
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (12 components)

CHP Unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN12 ZGEN12 IP32
Active • 2025-26 (T-4), 2024-25 (T-4) ...
3.71 MW
2 Engineers Way, Wembley, Middlesex, HA9 0JS (7 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX153 HA9
Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.87 MW
2 Samworth Way, Melton Mowbray LE13 1GA (5 components)

Existing Generation on existing site - CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.67 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (9 components)

District heating implementation of two gas CHP engines with no auxilliary load (3)

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX05 FLEX05 +1 more MK9
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.48 MW
3 Fountain Drive, Inchinnan Business Park, Paisley, PA4 9RF. (5 components)

MTU - 8V400064 1.013MW (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.91 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load (2)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED JAN BEZEMER & SONS LIMITED New Build Generating CMU Cleveland Nurseries CHP Cleveland Nurseries Gas Engines +2 more TS9
Active • 2027-28 (T-4), 2025-26 (T-4) ...
12.34 MW
47-53 Charterhouse Street, London, EC1M 6PB (14 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (3)

CHP and autogeneration Combined Heat and Power (CHP) CITIGEN (LONDON) LIMITED Existing Generating CMU Citigen Citigen +7 more EC1M
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.54 MW
4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA (2 components)

New CHP engine to be installed at 4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA (2)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX142 G32
Active • 2025-26 (T-4), 2022-23 (T-1)
530 London Rd, Thornton Heath CR7 7YE (1 component)

Behind the Meter CHP Unit

Active • 2025-26 (T-1)
1.41 MW
530 London Road, Croydon, CR7 7YE (4 components)

Gas fired CHP unit (3)

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG69 CR7
Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.82 MW
5 Coulman St, Thorne, Doncaster DN8 5JT (2 components)
• On-Site Generating CMU
• new build on site generating CMU
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU On-Site Energy - Chesterfield Poultry DN8
Active • 2027-28 (T-4), 2025-26 (T-4)
1.37 MW
66 Molesworth Street, London SE13 7EY (9 components)
• Gas fired CHP unit (2)
• Behind the Meter CHP Unit
Active • 2025-26 (T-1), 2024-25 (T-1) ...
10.18 MW
84 Castle St, Glasgow G4 0SF (1 component)

Behind the Meter CHP

Active • 2025-26 (T-1)
1.82 MW
96 Kings Rd, Immingham DN40 1QS (2 components)
• Existing Generating CHP
• New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU GB2502 DN40
Active • 2028-29 (T-4), 2025-26 (T-4)
3.23 MW
9 Handyside St, Kings Cross, London N1C 4BH (11 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
3.52 MW
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (9 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more RM8
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.34 MW
Address: Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (10 components)

Gas fired CHP (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Adlington Works, Market Street, Adlington, Lancashire, PR7 4HJ (3 components)

CHP with 1.280 rated capacity (2)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.28 MW
Loading map...
Showing 25 locations