Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

508 unique locations (3420 components) - Page 10 of 21

Active MW: 35388.22 MW
Inactive MW: 1729.46 MW
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (6 components)
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
14.16 MW
Joslin Avenue, Barnet, London, NW9 5HB (7 components)
• A reciprocating gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel.
• A reciprocating gas engine CHP site providing hot water to a local district heating network.
Reciprocating Engines CHP and autogeneration E.ON UK PLC Existing Generating CMU CEN002 Community Energy Aggregation 001 +1 more NW9
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
7.66 MW
Kemsley Mill, SittingBourne, Kent, ME10 2TD (5 components)
• One 40MWe gas Turbine Generation unit
• One 40MWe gas Turbine Generation unit which is part of the Kemsley 1 CHP Plant
CHP and autogeneration Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST05 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +1 more ME10
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
113.76 MW
Kent Road, Southampton, S017 3EA (2 components) Geocoding Needed

CHP plant

Combined Heat and Power (CHP) KIWI POWER LTD New Build Generating CMU Rejected
Inactive • 2022-23 (T-4), 2019-20 (T-1)
16.20 MW
Kimberlow Lane, Heslington, York, YO10 5FJ (2 components)

CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN08 ZGEN08 YO10
Active • 2025-26 (T-4), 2024-25 (T-4)
4.79 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (8 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX108 FLEX32 +1 more EH9
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
5.96 MW
Knapton Quarry, East Knapton, Malton, YO17 8JA (1 component)

A thermal treatment / CHP power generating unit located at Knapton Quarry in North Yorkshire.

Combined Heat and Power (CHP) Tetragen (Knapton) (UK) Ltd New Build Generating CMU KNAPTON QUARRY Conditional YO17
Inactive • 2022-23 (T-4)
6.74 MW
Knapton Quarry, Malton, YO17 8JA (1 component)

An energy from waste development adjacent to an existing waste management facility at Knapton Quarry Landfill, North Yorkshire, YO17 8JA. The plant will be fully CHP enabled advanced gasification waste …

CHP and autogeneration Tetragen (Knapton) (UK) Ltd New Build Generating CMU Tetragen (Knapton) Not Prequalified YO17
Inactive • 2021-22 (T-4)
6.74 MW
Lace factory, West Exe, Tiverton, Devon EX16 5LL (2 components)

Existing gas fired CHP

CHP and autogeneration SMARTESTENERGY LIMITED Existing Generating CMU Rejected EX16
Inactive • 2021-22 (T-4), 2018-19 (T-1)
1.82 MW
LADYSMITH ROAD, GRIMSBY, DN32 9EE (2 components)

CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX141 DN32
Active • 2025-26 (T-4), 2022-23 (T-1)
1.36 MW
Lake Rd, Trafford Park, Stretford, Manchester M17 1TU, United Kingdom (4 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.81 MW
Lancaster University, Bailrigg, Lancaster, LA1 4YW (4 components)

Gas fired CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX41 GENX41 +1 more LA1
Active • 2024-25 (T-4), 2023-24 (T-1) ...
6.73 MW
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (5 components)
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total connection capacity of 1.5MW.
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total connection capacity of 4.5MW.
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection capacity of 9MW.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
18.90 MW
Land off, Old School, Lane Hereford, HR4 9BP (3 components)
• A 13MW New Build Battery Storage site
• A 6MW New Build CHP site
• A New Build Battery Storage site
Storage (Duration 1h) Combined Heat and Power (CHP) NORIKER PERSEVERANCE LTD New Build Generating CMU Perseverance Battery 1 Perseverance Battery 2 +1 more HR4
Active • 2026-27 (T-4), 2024-25 (T-4)
10.35 MW
LANE END, MACKETTS LANE, HALE COMMON, ISLE OF WIGHT, PO30 3AS (1 component)

The CMU component will have a connection capacity of 4.6MW. Gas-fired reciprocating engine will be the technology used

Active • 2026-27 (T-4)
4.20 MW
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (13 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
• One asset 2.0MW CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX109 FLEX149 +3 more L40
Active • 2027-28 (T-4), 2026-27 (T-4) ...
19.61 MW
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (33 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
OCGT CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU11 GCMU11 +5 more DN40
Active • 2025-26 (T-4), 2024-25 (T-1) ...
73.27 MW
Latimer Business Park, Altendiez Way, Burton Latimer, Kettering, Northamptonshire, NN15 5YT (4 components)

Gas engine

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ05 GENZ05 +1 more NN15
Active • 2025-26 (T-4), 2024-25 (T-4) ...
7.00 MW
Leeds Rd, Huddersfield HD2 1FG (2 components)
• Behind the Meter CHP Unit
• Syngenta - CHP unit
Active • 2025-26 (T-1), 2024-25 (T-1)
11.41 MW
Leicester Royal Infirmary, Infirmary Square, Leicester, LE1 5WW (5 components)

CHP Unit

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU LeicsNHS LeicsNHS LE1
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
8.12 MW
Leicester Royal Infirmary: Infirmary Square, Leicester, LE1 5WW (1 component)

CHP unit

CHP and autogeneration KIWI POWER LTD Existing Generating CMU LeicsNHS LE1
Inactive • 2018-19 (T-1)
2.28 MW
Len Wright Salads Ltd, Hazeldene, Taylors Meanygate, Tarleton, Lancashire, PR4 6XB (2 components)

CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN15 PR4
Active • 2025-26 (T-4), 2023-24 (T-4)
1.18 MW
Lever House, Wood Street, Port Sunlight Wirral, CH42 4XN (2 components)

2x reciprocating gas engines with an aggregate gross capacity of 3.996 MW and net capacity of 3.908 MW

Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU UNILEVER LEVER HOUSE CH42
Active • 2028-29 (T-4), 2025-26 (T-1)
7.10 MW
Lhoist UK Ltd Hindlow Buxton SK17 0EL (4 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity. (2)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
CHP and autogeneration Combined Heat and Power (CHP) Utility I Ltd New Build Generating CMU Lhoist CHP Lhoist Hindlow CHP +2 more SK17
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Loading map...
Showing 25 locations