Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

513 unique locations (3442 components) - Page 16 of 21

Active MW: 35388.22 MW
Inactive MW: 1729.46 MW
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (10 components) Geocoding Needed

0.725MW Combined Heat and Power Plant Royal South Hants Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.08 MW
RPC Containers Limited, Haslingden Road, Guided, Blackburn, Lancashire, BB1 2PX (5 components) Geocoding Needed

CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GC2409 GENX38 +1 more BB1
Active • 2025-26 (T-4), 2024-25 (T-4) ...
7.18 MW
RPC Containers Ltd, Schofield Rd, Oakham LE15 6RW United Kingdom (3 components) Geocoding Needed

CHP Unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN13 ZGEN13 LE15
Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.21 MW
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (3 components)

Energy from Waste Recovery Facility (3)

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
RRRL-EfW Facility, Norman Road North, Belvedere, Kent, DA17 6JY (13 components) Geocoding Needed

Energy from Waste Recovery Facility

Active • 2028-29 (T-4), 2027-28 (T-4) ...
503.57 MW
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (9 components) Geocoding Needed

Two gas CHP in a horticultural environment with no aux load

Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.50 MW
Runnings Road, Cheltenham, Gloucestershire, GL51 9NQ (2 components) Geocoding Needed

A gas engine CHP site providing steam and electricity to an industrial unit

Inactive • 2022-23 (T-4), 2019-20 (T-1)
5.78 MW
Runnings Road, Swindon Village, Cheltenham, GL51 9NQ (7 components) Geocoding Needed

A gas engine CHP site providing steam and electricity to an industrial unit

Reciprocating Engines Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU IMP_SPX CHP OSG_Aggregated +2 more GL51
Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.60 MW
Rydings lane, North Meols, West Lancashire, Lancashire, PR9 8EB (4 components) Geocoding Needed

A gas fuelled Combined heat and Power plant

Combined Heat and Power (CHP) SECURE GENERATION LIMITED Existing Generating CMU Melrow Melrow +2 more PR9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.24 MW
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, Norfolk, PE34 3AL (2 components) Geocoding Needed
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated anciliary plant and buildings.
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated ancillary plant and buildings.
CHP and autogeneration Combined Heat and Power (CHP) Palm Paper Limited Existing Generating CMU Palm Paper CHP Palm Paper CHP PE34
Active • 2028-29 (T-4), 2021-22 (T-4)
78.50 MW
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (11 components) Geocoding Needed
• Power Station for Paper plant made up of 1x35MW Gas engine
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
201.09 MW
Salisbury District Hospital, Odstock Road, Salisbury, Wiltshire. SP2 8BJ. (1 component) Geocoding Needed

1 x 850kW natural gas genset feeding site

CHP and autogeneration LIMEJUMP LTD Existing Generating CMU Avocardos SP2
Inactive • 2018-19 (T-1)
1.68 MW
Sallow Rd, Weldon Ind Est, Corby Northants, NN17 5JX (4 components) Geocoding Needed

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network.

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
45.90 MW
Saltend Power Station, Saltend, Hull, HU12 8GA (33 components) Geocoding Needed
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10758.68 MW
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (21 components)

CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENY35 GENY35 +6 more HP22
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.84 MW
Samian Way, Aston, Clinton, Aylesbury, England, HP22 5EZ (21 components) Geocoding Needed

CHP unit

Active • 2025-26 (T-4), 2024-25 (T-4) ...
25.52 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (11 components) Geocoding Needed

Callington - Existing Site CHP unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.74 MW
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (10 components) Geocoding Needed
• Gas CHP in horticultural environment providing heat & electricity for crop growth
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
14.01 MW
Sapphire Mill, Glenwood Rd, Leslie, Glenrothes KY6 3AB (1 component) Geocoding Needed

Existing Generating CMU/

Active • 2025-26 (T-4)
School Road, Aberdeen AB24 1TU (13 components) Geocoding Needed
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.63 MW
Seal Sands, Middlesborough, TS2 1UB (12 components) Geocoding Needed

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
11.20 MW
Seal Sands, Middlesbrough, TS2 1UB (12 components) Geocoding Needed
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
11.20 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (21 components) Geocoding Needed
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
794.87 MW
Loading map...
Showing 25 locations