Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

457 unique locations (2799 components) - Page 18 of 19

Active MW: 12971.49 MW
Inactive MW: 157.64 MW
Unit 2898 Tuscany Park Wakefield WF6 2TZ (2 components)

EnerG 1000 CHP (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.91 MW
Unit 3015 Western Approach Distribution Park Govier Way Bristol BS35 4GG (2 components)

E1000 CHP unit (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.89 MW
Unit 3016 Hereford Street Bolton BL1 8HU (2 components)

E1000 CHP (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.90 MW
UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST, GLENFIELD CLINIC, GROBY ROAD, LEICESTER, LE3 9QP (5 components)

CHP plant (3)

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU LeicsNHS LeicsNHS LE3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.62 MW
University of East Anglia, Norwich Research Park, Norwich, NR4 7TJ (7 components)

CHP (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
7.28 MW
University of Warwick, Coventry, CV4 7AL (48 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL (2)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GC2426 GCMU18 +4 more CV4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Valley Park Industrial Estate, Meadow Gate, Wombwell, Barnsley, S73 0UN (1 component)

Generating unit

Active • 2025-26 (T-4)
Waddon Marsh Purley Way Croydon CR0 4NX (1 component)

A reciprocating gas engine CHP providing hot water to a local heat network

CHP and autogeneration E.ON UK PLC Existing Generating CMU CEN003 Rejected CR0
Inactive • 2018-19 (T-1)
Waddon Marsh Purley Way Croydon CR0 4NX (1 component)

A reciprocating gas engine CHP providing hot water to a local heat network

CHP and autogeneration E.ON UK PLC Existing Generating CMU CEN003 Rejected CR0
Inactive • 2021-22 (T-4)
Warehouse R Royal Victoria Dock Northside London E16 1BA (2 components)

1.2MW Combined Heat and Power Engine (2)

CHP and autogeneration EXCEL DISTRICT ENERGY COMPANY LIMITED Existing Generating CMU EDEC EDEC Rejected E16
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Warehouse R Royal Victoria Dock Northside London E16 1BA (2 components)

1.2MW Combined Heat and Power Engine (2)

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Warrington Hospital, Lovely Lane, Warrington, CheshireWA5 1QG (1 component) Geocoding Needed

1 x Natural Gas Fired CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU Rejected
Inactive • 2019-20 (T-1)
Warrington Hospital, Lovely Lane, Warrington, Cheshire WA5 1QG (1 component)

1 x Natural Gas Fired CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU XGEN29 WA5
Inactive • 2019-20 (T-1)
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (11 components)

Warrington Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.17 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (6 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated 3 CE_Aggregated 3 +1 more HA9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.06 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
36.30 MW
Westexe, Tiverton, Devon, EX16 5LL (6 components)

2026 kW CHP unit (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.65 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (12 components)

One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load. (3)

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +2 more WR11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.74 MW
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (2 components)

New-Build CHP Generating Unit at Berry Wicks Farm. (2)

Active • 2028-29 (T-4), 2025-26 (T-4)
1.26 MW
Wight Salads Arreton Newport Isle of Wight PO30 3AR (2 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
5.48 MW
Wight Salads Arreton Newport Isle of Wight PO30 3AR (3 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Winnington CHP Winnington Lane Winnington Northwich Cheshire (1 component) Geocoding Needed

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

Active • 2027-28 (T-4)
14.23 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (25 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Loading map...
Showing 25 locations