CHP and autogeneration

508 unique locations (3420 components) - Page 18 of 21

Active MW: 35388.22 MW
Inactive MW: 1729.46 MW
Buxton Road, Hindlow, Buxton, SK17 0EL (1 component)

Generating unit

Active • 2025-26 (T-4)
Burnside Mills, Kendal,Cumbria,LA9 6PZ (6 components)

Gas fired CHP unit (3)

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG52 KPEG52 LA9
Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.92 MW
Burnside Mills, Kendal, Cumbria, LA9 6PZ (6 components)

Gas fired CHP unit

Active • 2026-27 (T-4), 2025-26 (T-4) ...
24.49 MW
Buckland Gardens, Broadway, Worcestershire WR12 7LY (4 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 1.935MW CHP engine in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
7.18 MW
Broadgreen Hospital, Thomas Drive, Liverpool L14 3LB (11 components)
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity of 1.949 MW
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity of 1.970 MW
• 1 x Gas reciprocating engine with a total rated gross power capacity of 2.185 MW and total net power capacity of 2.155 MW
CHP and autogeneration Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Royal Liverpool & Broadgreen Hospitals Royal Liverpool & Broadgreen Hospitals +5 more L14
Active • 2026-27 (T-4), 2025-26 (T-4) ...
35.81 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA. (12 components)
• existing on site CHP
• existing onsite CHP
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected DN16
Active • 2027-28 (T-4), 2026-27 (T-4) ...
105.77 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, England, DN16 1XA (12 components)
• existing CHP on site.
• existing on site CHP
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected DN16
Active • 2027-28 (T-4), 2026-27 (T-4) ...
69.98 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
DSR Combined Heat and Power (CHP) GRIDBEYOND LIMITED Proven DSR CMU Endeco Technologies CMU1 DN16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
114.58 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW. (5 components)

CHP Engine 3.360MW

Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.20 MW
Brigg Road, Scunthorpe, DN16 1BP (2 components)

CHP units

CHP and autogeneration Combined Heat and Power (CHP) KiWi Power Ltd Existing Generating CMU British Steel British Steel DN16
Inactive • 2019-20 (T-1), 2018-19 (T-1)
78.26 MW
Briar Chemicals, Sweet Briar Rd, Norwich NR6 5AP (1 component)

Behind the Meter CHP Unit

Active • 2025-26 (T-1)
1.82 MW
Bramhall Moor Ln, Pepper Rd, Hazel Grove, Stockport SK7 5BJ (2 components)

CHP exporting to a private wire network in a manufacturing environment.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected SK7
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Bradford Royal Infirmary, Duckworth Lane, Bradford, West Yorkshire, BD9 6RJ (4 components)

Behind the Meter CHP Unit

Active • 2025-26 (T-1)
0.64 MW
Bower Building, University of Glasgow, University Avenue, G12 8QQ (2 components)

CHP generator exporting to private wire network at the University of Glasgow.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected G12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Bo'ness Road, Grangemouth, Stirlingshire, FK3 9XQ (11 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS

Active • 2027-28 (T-4), 2026-27 (T-4) ...
607.65 MW
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (2 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS (2)

CHP and autogeneration GRANGEMOUTH CHP LIMITED Existing Generating CMU Grangemouth CHP Grangemouth CHP FK3
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Boiler House, Central Manchester University Hospital, Oxford Road, Manchester M13 9WL, UK (2 components)

The Prospective Generating Unit will be an Edina TCG 2032B V16 4.5MWe CHP Gas Engine (or similar) situated on Central Manchester University Hospital site.

CHP and autogeneration Combined Heat and Power (CHP) EQUANS BUILDINGS LIMITED New Build Generating CMU Central Manchester Hospital Central Manchester Hospital Conditional M13
Inactive • 2022-23 (T-4), 2021-22 (T-4)
7.86 MW
Blackshaw Rd, London SW17 0QT (5 components)

CHP on a hospital site

CHP and autogeneration Combined Heat and Power (CHP) DISTRIBUTED ENERGY CUSTOMER SOLUTIONS LIMITED New Build Generating CMU St George's CHP Units St George's CHP Units +1 more SW17
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
14.16 MW
Birmingham Children?s Hospital, Steelhouse Lane, Birmingham, B4 6NH (4 components)

1.6MW Combined Heat and Power Plant at Birmingham Children Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.44 MW
Birds Eye Limited. Whapload Road, Lowestoft, Suffolk NR32 1XQ (3 components)
• 1 x 3.3 MW gas engine CHP plant
• 3.348 MW gas engine CHP plant
CHP and autogeneration LIMEJUMP LTD Existing Generating CMU EXC_02 NR32
Inactive • 2021-22 (T-4), 2018-19 (T-1) ...
6.03 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (8 components)
• 2025 KW gas fire engine
• 2025kW gas engine
Active • 2028-29 (T-4), 2025-26 (T-4) ...
12.31 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (2 components)

2025kW gas engine (2)

Active • 2025-26 (T-1), 2024-25 (T-1)
3.70 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (2 components)

2025 KW gas fire engine (2)

Active • 2025-26 (T-1), 2024-25 (T-1)
3.70 MW
Beach Esplanade, Aberdeen AB24 5NR (9 components)

District heating implementation with one asset 1MW and no auxiliary load

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected AB24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.31 MW
Loading map...
Showing 25 locations