Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

279 unique locations (2237 components) - Page 2 of 12

Active MW: 12971.49 MW
Inactive MW: 157.64 MW
Alderley Park Limited, Alderley Park, Congleton Road, Nether Alderley, Macclesfield, SK10 4TF. (1 component)

1 X gas engine with a gross capacity of 5.400 MW at MCR and ISO conditions

Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Alderley Park Limited SK10
Active • 2025-26 (T-1)
3.23 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (10 components)

One Jenbacher CHP engine with a generation capacity of 3.36 MW (3)

Reciprocating Engines Reciprocating engines Combined Heat and Power (CHP) GLASS LEAF POWER LIMITED Existing Generating CMU Branfield Energy Centre Glassleaf Power +2 more HU15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.31 MW
Ashgrove Road West, Aberdeen AB16 5UL (13 components)

District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (3)

DSR CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX24 FLEX24 Rejected AB16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.73 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (6 components)

Existing Generation on existing site - CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.67 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (10 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW (2)
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2025-26 (T-1), 2024-25 (T-1) ...
5.26 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (18 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW (2)
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.23 MW
Aventine Way, Glebe Farm Industrial Estate, Rugby, CV21 1HA (14 components)

A gas CHP supplying a manufacturing facility (3)

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU BVC_CHP BVC_CHP +2 more CV21
Active • 2027-28 (T-4), 2025-26 (T-4) ...
3.99 MW
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (4 components)

on site generating CMU (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
5.40 MW
Barnsley Facilities Services Limited Estates & Facilities Department Gawber Road Barnsley S75 2EP (5 components)

1 MW CHP generation (3)

Combined Heat and Power (CHP) LIMEJUMP LTD Existing Generating CMU EXL202 EXL202 S75
Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.91 MW
Barrack Road, Exeter, EX2 5DW. (5 components)

1.521 MW CHP unit (3)

Active • 2026-27 (T-4), 2024-25 (T-4) ...
2.62 MW
Barrier Park CHP, North Woolwich Road, Silvertown, London, E16 2HP (9 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more E16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.38 MW
Barrow Man Road Birchington Kent CT7 0AX (9 components)

Two CHP engines in horticultural environment with no auxilliary load (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.73 MW
Bath CHP, Midland Road, Bath, BA2 3EW (9 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more BA2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.27 MW
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH (4 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the … (2)

Combined Heat and Power (CHP) BRING ENERGY LIMITED Existing Generating CMU Battersea Battersea SW11
Active • 2025-26 (T-1), 2024-25 (T-1)
6.73 MW
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH (4 components)

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the … (2)

Combined Heat and Power (CHP) BRING ENERGY LIMITED Existing Generating CMU Battersea Battersea SW11
Active • 2028-29 (T-4), 2027-28 (T-4)
6.73 MW
Beach Esplanade, Aberdeen AB24 5NR (9 components)

District heating implementation with one asset 1MW and no auxiliary load (3)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected AB24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.73 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (2 components)

2025 KW gas fire engine (2)

Active • 2025-26 (T-1), 2024-25 (T-1)
3.70 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (2 components)

2025kW gas engine (2)

Active • 2025-26 (T-1), 2024-25 (T-1)
3.70 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (2 components)

2025 KW gas fire engine (2)

Active • 2028-29 (T-4), 2025-26 (T-4)
1.84 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (2 components)

2025kW gas engine (2)

Active • 2028-29 (T-4), 2025-26 (T-4)
1.84 MW
Birmingham Children?s Hospital, Steelhouse Lane, Birmingham, B4 6NH (4 components)

1.6MW Combined Heat and Power Plant at Birmingham Children Hospital (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (9 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS (3)

CHP and autogeneration Combined Heat and Power (CHP) GRANGEMOUTH CHP LIMITED Existing Generating CMU Grangemouth CHP Grangemouth CHP +1 more FK3
Active • 2027-28 (T-4), 2026-27 (T-4) ...
259.76 MW
Bradford Royal Infirmary, Duckworth Lane, Bradford, West Yorkshire, BD9 6RJ (4 components)

Behind the Meter CHP Unit

Active • 2025-26 (T-1)
0.64 MW
Briar Chemicals, Sweet Briar Rd, Norwich NR6 5AP (1 component)

Behind the Meter CHP Unit

Active • 2025-26 (T-1)
1.82 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW. (5 components)

CHP Engine 3.360MW (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.13 MW
Loading map...
Showing 25 locations