Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

457 unique locations (2799 components) - Page 3 of 19

Active MW: 12971.49 MW
Inactive MW: 157.64 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (10 components)

CHP engine in horticultural environment with no auxilliary load (3)

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX02 FLEX02 +2 more CT7
Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.82 MW
Telford Dairy Limited, Donnington Wood Business Park, Telford, Shropshire, TF2 7GJ (4 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
3.83 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (15 components)

The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year. (3)

Reciprocating Engines Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP) SPARK STEAM LIMITED Existing Generating CMU Spark Steam Energy Centre Spark Steam Energy Centre +3 more TS23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (6 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year. (2)
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
CHP and autogeneration Combined Heat and Power (CHP) SPARK STEAM LIMITED Existing Generating CMU Spark Steam Energy Centre Spark Steam Energy Centre +1 more TS23
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Taw Valley Creamery, South Weeke, North Tawton, Devon, England, EX20 2DA (4 components)

CHP unit (3)

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ02 GENZ02 +1 more EX20
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1.76 MW
Syensqo Oldbury, Trinity St, Oldbury, B69 4LN (1 component)

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GBD048 / GB2548 B69
Active • 2025-26 (T-4)
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)

Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.89 MW
Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB (1 component)

Generating Plant located at Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU AW Stoneywood AB21
Inactive • 2021-22 (T-4)
Stoneykirk Road, Stranraer, DG9 7BU (9 components)

Gas fired CHP unit (3)

CHP and autogeneration Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Base Power KPEG72 DG9
Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.38 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (9 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.75 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (4 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (3)

Active • 2025-26 (T-1), 2019-20 (T-1) ...
1.35 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (10 components)

Turbomach M50 Natural Gas fired CHP unit (3)

CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU07 GCMU07 +4 more BA14
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.80 MW
Staverton, Trowbridge, BA14 6PG (1 component)

Turbomach M50 Natural Gas fired CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU07 BA14
Active • 2025-26 (T-1)
4.47 MW
Station Road, Wigton, Cumbria CA7 9BG (20 components)
• Gas engine (2)
• Gas turbine
OCGT CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU16 GCMU16 +10 more CA7
Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.23 MW
Station Road, Chartham, Kent, CT4 7JA (1 component)

Generating Plant located at Station Road, Chartham, Kent, CT4 7JA

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU AW Chartham CT4
Inactive • 2021-22 (T-4)
Station Road, Burton Latimer, KEttering, Northants, NN15 5JR (1 component)

CHP

CHP and autogeneration KIWI POWER LTD Existing Generating CMU Weetabix Rejected NN15
Inactive • 2018-19 (T-1)
Station Road, Burton Latimer, Kettering, Northants, NN15 5JR (2 components)

CHP (2)

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Weetabix NN15
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB (3 components)
• 2 x On-site turbo alternators
• 6 x On-site turbo alternators
• Power Recovery Train
Inactive • 2019-20 (T-1)
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (9 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more E3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.38 MW
Staithes Road, Preston, Hull, HU12 8TB (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.49 MW
Staithes Road, Preston, East Riding of Yorkshire HU12 8TB (2 components)

On-Site Generating CMU.

Active • 2025-26 (T-1), 2025-26 (T-4)
1.97 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (3 components)

Gas Fired CHP (3)

Combined Heat and Power (CHP) E.ON UK PLC New Build Generating CMU SON_CHP SON_CHP HX4
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.78 MW
Springfields Salwick, Preston, PR4 0XJ (2 components)

2 x CHP (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Speke Operations, Fleming Rd, Liverpool L24 9LN (5 components)
• 2 x gas turbines with a total rated gross power capacity of 6.830 MW and total net power capacity of 6.807 (2)
• Speke combined heat and power plant.
CHP and autogeneration Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU SPEKE CHP SPEKE CHP L24
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Speke Blvd, Speke, Liverpool L24 9LE (3 components)
• on site generating CMU (2)
• On-site Generating CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.61 MW
Loading map...
Showing 25 locations