Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

174 unique locations (2385 components) - Page 4 of 7

Newton Aycliffe CO Durham DL5 6EA (38 components)
• This is a long standing existing CHP unit located on land within a manufacturing site.
• This is an existing CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.22 MW
NEWLINCS Integrated Waste Management Facility. South Marsh Road, Stallingborough, NE Lincs, DN41 8BZ (4 components)

The component corresponds to one gas turbines embedded into a CHP located on an industrial plant. The turbine exports electricity onto the site's private network.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (17 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602 (2)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.53 MW
Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP (9 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Montgomery Road, Aberdeen AB24 2YA (18 components)

District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.54 MW
Molesworth Street Citibank Data Centre South (85821) (3 components)

Existing gas powerd CHP autogeneration unit

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Midland Road, Bath, BA2 3EW (9 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Michelin Tyre Company Limited Campbell Road Stoke On Trent Staffordshire ST4 4EY (3 components)

CHP engine supplying heat and power to an industrial unit

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (4 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Melrow Nursery, Rydings Lane, Southport PR9 8EB (15 components)

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Media City Prestwood Rd Salford M50 2EQ (3 components)

2MW CHP located at Salford

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Marsh Road, Banks, Southport PR9 8DX (19 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (21 components)
• The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 5.535MW and additional PSEUDO MPAN's are fitted.
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
MAGNA PARK, CROSSLEY DRIVE, Milton Keynes MK17 8FL (1 component)

The CMU component BARR17 will consist of one CHP engine with a generation capacity of 4.5 MW.

Inactive • 2021-22 (T-4)
London Rd, Purfleet RM19 1SD (22 components)

Gas-fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
14.61 MW
Loampit Vale Elmira Street Lewisham London SE13 7DJ (3 components)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Lhoist UK Ltd Hindlow Buxton SK17 0EL (16 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (47 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.96 MW
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (17 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
• One asset 2.0MW CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.81 MW
Lace factory, West Exe, Tiverton, Devon EX16 5LL (3 components)

Existing gas fired CHP

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Knapton Quarry, Malton, YO17 8JA (1 component)

An energy from waste development adjacent to an existing waste management facility at Knapton Quarry Landfill, North Yorkshire, YO17 8JA. The plant will be fully CHP enabled advanced gasification waste …

Inactive • 2021-22 (T-4)
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (22 components)

Combined Heat and Power Plant Olympic Park London

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.56 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (11 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kemsley Mill, SittingBourne, Kent, ME10 2TD (6 components)
• One 40MWe gas Turbine Generation unit
• One 40MWe gas Turbine Generation unit which is part of the Kemsley 1 CHP Plant
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
10.93 MW
Loading map...
Showing 25 locations