Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

99 unique locations (781 components) - Page 4 of 4

Racecourse Road Newbury West Berkshire RG14 7NZ (2 components)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Red Roofs Nursery Limited Dunswell Road Cottingham Hull East Yorkshire HU16 4JT (3 components)

CHP engine supplying heat and power to agricultural greenhouses

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Red Roofs Nursery Limited North Moor Lane Cottingham HU16 4JN (3 components)

CHP engine supplying heat and power to agricultural greenhouses

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1118.24 MW
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, Norfolk, PE34 3AL (2 components)
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated anciliary plant and buildings.
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated ancillary plant and buildings.
Active • 2028-29 (T-4), 2021-22 (T-4)
42.50 MW
Salisbury District Hospital, Odstock Road, Salisbury, Wiltshire. SP2 8BJ. (1 component)

1 x 850kW natural gas genset feeding site

Inactive • 2018-19 (T-1)
Sallow Rd, Weldon Ind Est, Corby Northants, NN17 5JX (9 components)

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network.

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Seal Sands, Middlesborough, TS2 1UB (20 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seal Sands, Middlesbrough, TS2 1UB (20 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Shelton Road, Willowbrook Industrial Estate, Corby, Northamptonshire, NN17 5XH (1 component)

The CMU will be an energy from waste generator and will consist of a steam turbine

Inactive • 2021-22 (T-4)
Showground Road, Bridgwater, TA6 6AJ (2 components)

An energy from waste development situated on Showground Road, Bridgwater with an export capacity of 7.75 MWe

Inactive • 2021-22 (T-4)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (2 components)

10.754 MW CHP Plant with 2 new Gas Turbines

Inactive • 2021-22 (T-4), 2018-19 (T-1)
SO45 1TX (3 components)
• TG1B is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which TG1B of medium size. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power and steam generation units on site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - Unit 3).
• Unit 3 is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - TG1B).
• Unit 5 is part of the aggregated CMU EM3-21, which made up of 3 Generating Units of which Unit 5 is the largest. This Generating Unit forms the E_FAWN-1 BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (MSID 7081). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW.
Inactive • 2021-22 (T-4)
Speke Operations, Fleming Rd, Liverpool L24 9LN (7 components)
• 2 x gas turbines with a total rated gross power capacity of 6.830 MW and total net power capacity of 6.807
• Speke combined heat and power plant.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Waddon Marsh Purley Way Croydon CR0 4NX (2 components)

A reciprocating gas engine CHP providing hot water to a local heat network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Warehouse R Royal Victoria Dock Northside London E16 1BA (6 components)

1.2MW Combined Heat and Power Engine

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
41.84 MW
Loading map...
Showing 24 locations