Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

314 unique locations (2726 components) - Page 6 of 13

Active MW: 35388.22 MW
Inactive MW: 1729.46 MW
Muller UK Limited, Tern Valley Business Park, Market Drayton, Shropshire, TF9 3SQ (4 components) Geocoding Needed

On-Site Generating CMU

Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
15.85 MW
Muller Milk & Ingredients Ltd, Stonebridge Cross, Hampton Lovett, Droitwich, WR9 0NX (4 components) Geocoding Needed

On-Site Generating CMU

Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
16.10 MW
Muller Milk and Ingredients Market Way, North Petherton, Bridgwater, TA6 6DF (4 components) Geocoding Needed

On-Site Generating CMU

Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
11.15 MW
Morrisons Farmers Boy, Cemetery Road, Greenside Park, Bradford BD8 9RU (2 components) Geocoding Needed

On-Site Generating CMU

Active β€’ 2025-26 (T-1), 2024-25 (T-1)
2.67 MW
Moorcroft Drive, Wednesbury, WS10 7DE (6 components) Geocoding Needed

EnerG 1000 CHP

Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
7.24 MW
Montgomery Road, Aberdeen AB24 2YA (13 components) Geocoding Needed
β€’ District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
β€’ District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
11.87 MW
Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH (6 components) Geocoding Needed

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Monk CE_Monk +1 more EX1
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
6.50 MW
Minworth Sewage Treatment Works, Kingsbury Road, Minworth, Sutton Coldfield, B76 9DP (4 components) Geocoding Needed

CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ04 GENZ04 +1 more B76
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
9.35 MW
Mill Nurseries, Ottringham Road, Keyingham, Hull, HU12 9RX (8 components) Geocoding Needed

Gas fired CHP unit

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG57 KPEG57 HU12
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
42.73 MW
MILLBROOK PARK ENERGY CENTRE, ROYAL ENGINEERS WAY, LONDON, NW7 1TF (6 components) Geocoding Needed

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated 3 CE_Aggregated 3 +1 more NW7
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
6.02 MW
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (11 components) Geocoding Needed
β€’ A gas engine CHP site providing hot water to an industrial unit
β€’ CHP engine supplying heat and power to an industrial unit
CHP and autogeneration Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU MIC_HEY MIC_HEY +4 more ST4
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
18.58 MW
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (11 components) Geocoding Needed

Nantwich Existing Site CHP

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
13.60 MW
Mettis Aerospace Limited, Redditch Works, Windsor Road, Redditch, Worcestershire, B97 6EF (3 components) Geocoding Needed

On-Site Generating CMU

Active β€’ 2028-29 (T-4), 2025-26 (T-1) ...
7.93 MW
Melrow Nursery, Rydings Lane, Southport PR9 8EB (11 components) Geocoding Needed

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …

Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
6.04 MW
Marston House, Otley Rd, Baildon Shipley, BD17 7JR (1 component) Geocoding Needed

Generating unit

Active β€’ 2025-26 (T-4)
Marsh Road, Far Banks, North Meols, Banks, West Lancashire, Lancashire, PR9 8DX (8 components) Geocoding Needed
β€’ A gas fuelled CHP plant
β€’ A gas fuelled Combined Heat and Power plant
Combined Heat and Power (CHP) EFFICIENT GENERATION LIMITED Existing Generating CMU Aldersgrove Aldersgrove +2 more PR9
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
17.07 MW
Marsh Road, Banks, Southport PR9 8DX (14 components) Geocoding Needed
β€’ Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
β€’ The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
β€’ The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX33 FLEX33 +1 more PR9
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
12.64 MW
Maple Quay CHP, Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP (9 components) Geocoding Needed

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more SE16
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.89 MW
Magna House, Stafford Park 3, Telford, Shropshire, TF3 3BH (6 components) Geocoding Needed

One CHP, generating for site load which exceeds generating capacity. No aux load.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX169 TF3
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
4.52 MW
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (15 components) Geocoding Needed
β€’ On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
β€’ On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GridBeyond GBD009 LL14
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
155.01 MW
Macketts Lane, Arreton, Isle of Wight PO30 3AS (1 component) Geocoding Needed

The CMU component will have a connection capacity of 7.5MW. Gas-fired reciprocating engine will be the technology used

Active β€’ 2026-27 (T-4)
6.85 MW
London Rd, Purfleet RM19 1SD (11 components) Geocoding Needed

Gas-fired CHP unit

Active β€’ 2024-25 (T-4), 2023-24 (T-1) ...
53.57 MW
Lockerbie Creamery, Lockerbie, England. DG11 1LW (10 components) Geocoding Needed

CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX37 GENX37 +2 more DG11
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
10.36 MW
Little Horton Lane, Bradford West Yorkshire, BD5 0NA (1 component) Geocoding Needed

Behind the Meter CHP Unit

Active β€’ 2025-26 (T-1)
0.28 MW
Loading map...
Showing 25 locations