Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

314 unique locations (2726 components) - Page 7 of 13

Active MW: 35388.22 MW
Inactive MW: 1729.46 MW
LADYSMITH ROAD, GRIMSBY, DN32 9EE (2 components) Geocoding Needed

CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX141 DN32
Active β€’ 2025-26 (T-4), 2022-23 (T-1)
1.36 MW
Lake Rd, Trafford Park, Stretford, Manchester M17 1TU, United Kingdom (4 components) Geocoding Needed

On-Site Generating CMU

Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
9.81 MW
Lancaster University, Bailrigg, Lancaster, LA1 4YW (4 components) Geocoding Needed

Gas fired CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX41 GENX41 +1 more LA1
Active β€’ 2024-25 (T-4), 2023-24 (T-1) ...
6.73 MW
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (5 components) Geocoding Needed
β€’ Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total connection capacity of 1.5MW.
β€’ Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total connection capacity of 4.5MW.
β€’ Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection capacity of 9MW.
Active β€’ 2024-25 (T-4), 2023-24 (T-1) ...
18.90 MW
Land off, Old School, Lane Hereford, HR4 9BP (3 components) Geocoding Needed
β€’ A 13MW New Build Battery Storage site
β€’ A 6MW New Build CHP site
β€’ A New Build Battery Storage site
Storage (Duration 1h) Combined Heat and Power (CHP) NORIKER PERSEVERANCE LTD New Build Generating CMU Perseverance Battery 1 Perseverance Battery 2 +1 more HR4
Active β€’ 2026-27 (T-4), 2024-25 (T-4)
10.35 MW
LANE END, MACKETTS LANE, HALE COMMON, ISLE OF WIGHT, PO30 3AS (1 component) Geocoding Needed

The CMU component will have a connection capacity of 4.6MW. Gas-fired reciprocating engine will be the technology used

Active β€’ 2026-27 (T-4)
4.20 MW
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (13 components) Geocoding Needed
β€’ Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
β€’ One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
β€’ One asset 2.0MW CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX109 FLEX149 +3 more L40
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
19.61 MW
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (33 components) Geocoding Needed
β€’ 2.8MWe back pressure steam turbine
β€’ 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
OCGT CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GCMU11 GCMU11 +5 more DN40
Active β€’ 2025-26 (T-4), 2024-25 (T-1) ...
73.27 MW
Latimer Business Park, Altendiez Way, Burton Latimer, Kettering, Northamptonshire, NN15 5YT (4 components) Geocoding Needed

Gas engine

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENZ05 GENZ05 +1 more NN15
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
7.00 MW
Leeds Rd, Huddersfield HD2 1FG (2 components) Geocoding Needed
β€’ Behind the Meter CHP Unit
β€’ Syngenta - CHP unit
Active β€’ 2025-26 (T-1), 2024-25 (T-1)
11.41 MW
Len Wright Salads Ltd, Hazeldene, Taylors Meanygate, Tarleton, Lancashire, PR4 6XB (2 components) Geocoding Needed

CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN15 PR4
Active β€’ 2025-26 (T-4), 2023-24 (T-4)
1.18 MW
Lever House, Wood Street, Port Sunlight Wirral, CH42 4XN (2 components) Geocoding Needed

2x reciprocating gas engines with an aggregate gross capacity of 3.996 MW and net capacity of 3.908 MW

Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU UNILEVER LEVER HOUSE CH42
Active β€’ 2028-29 (T-4), 2025-26 (T-1)
7.10 MW
Lindum Mill, Ashby Road, Shepshed, Leicestershire, LE12 9BS (3 components) Geocoding Needed

On-Site Generating CMU

Active β€’ 2028-29 (T-4), 2025-26 (T-1) ...
3.28 MW
Lister Hospital, Coreys Mill Lane, Stevenage, Hertfordshire, SG1 4AB (2 components) Geocoding Needed

1 x Gas reciprocating engine with a total rated gross power capacity of 1.400 MW and a net power capacity of 1.374 MW after considering the generator auxiliary load.

Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Lister Hospital SG1
Active β€’ 2028-29 (T-4), 2025-26 (T-1)
2.46 MW
Little Horton Lane, Bradford West Yorkshire, BD5 0NA (1 component) Geocoding Needed

Behind the Meter CHP Unit

Active β€’ 2025-26 (T-1)
0.28 MW
Lockerbie Creamery, Lockerbie, England. DG11 1LW (10 components) Geocoding Needed

CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GENX37 GENX37 +2 more DG11
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
10.36 MW
London Rd, Purfleet RM19 1SD (11 components) Geocoding Needed

Gas-fired CHP unit

Active β€’ 2024-25 (T-4), 2023-24 (T-1) ...
53.57 MW
Macketts Lane, Arreton, Isle of Wight PO30 3AS (1 component) Geocoding Needed

The CMU component will have a connection capacity of 7.5MW. Gas-fired reciprocating engine will be the technology used

Active β€’ 2026-27 (T-4)
6.85 MW
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (15 components) Geocoding Needed
β€’ On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
β€’ On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GridBeyond GBD009 LL14
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
155.01 MW
Magna House, Stafford Park 3, Telford, Shropshire, TF3 3BH (6 components) Geocoding Needed

One CHP, generating for site load which exceeds generating capacity. No aux load.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX169 TF3
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
4.52 MW
Maple Quay CHP, Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP (9 components) Geocoding Needed

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more SE16
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.89 MW
Marsh Road, Banks, Southport PR9 8DX (14 components) Geocoding Needed
β€’ Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
β€’ The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
β€’ The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX33 FLEX33 +1 more PR9
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
12.64 MW
Marsh Road, Far Banks, North Meols, Banks, West Lancashire, Lancashire, PR9 8DX (8 components) Geocoding Needed
β€’ A gas fuelled CHP plant
β€’ A gas fuelled Combined Heat and Power plant
Combined Heat and Power (CHP) EFFICIENT GENERATION LIMITED Existing Generating CMU Aldersgrove Aldersgrove +2 more PR9
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
17.07 MW
Marston House, Otley Rd, Baildon Shipley, BD17 7JR (1 component) Geocoding Needed

Generating unit

Active β€’ 2025-26 (T-4)
Melrow Nursery, Rydings Lane, Southport PR9 8EB (11 components) Geocoding Needed

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …

Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
6.04 MW
Loading map...
Showing 25 locations