CHP and autogeneration

79 unique locations (948 components) - Page 1 of 4

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (15 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
9.05 MW
Warehouse R Royal Victoria Dock Northside London E16 1BA (9 components)

1.2MW Combined Heat and Power Engine

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Waddon Marsh Purley Way Croydon CR0 4NX (3 components)

A reciprocating gas engine CHP providing hot water to a local heat network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.09 MW
Thearne Lane Woodmansey Beverley HU17 0SA (6 components)

Two gas CHP engines in commercial horticultural environment with no auxilliary load

Active • 2025-26 (T-4), 2023-24 (T-4) ...
1.13 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (9 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2023-24 (T-4) ...
11.64 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (37 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
23.13 MW
Speke Operations, Fleming Rd, Liverpool L24 9LN (9 components)
• 2 x gas turbines with a total rated gross power capacity of 6.830 MW and total net power capacity of 6.807
• Speke combined heat and power plant.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Southport & Formby District General hospital, Town Lane Kew, Southport PR8 6PN (4 components)

Gas reciprocating engine.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
SO45 1TX (3 components)
• TG1B is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which TG1B of medium size. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power and steam generation units on site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - Unit 3).
• Unit 3 is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - TG1B).
• Unit 5 is part of the aggregated CMU EM3-21, which made up of 3 Generating Units of which Unit 5 is the largest. This Generating Unit forms the E_FAWN-1 BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (MSID 7081). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW.
Inactive • 2021-22 (T-4)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (3 components)

10.754 MW CHP Plant with 2 new Gas Turbines

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (14 components)

8.3MW Gas Turbine installation

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.47 MW
Showground Road, Bridgwater, TA6 6AJ (1 component)

An energy from waste development situated on Showground Road, Bridgwater with an export capacity of 7.75 MWe

Inactive • 2021-22 (T-4)
Shelton Road, Willowbrook Industrial Estate, Corby, Northamptonshire, NN17 5XH (1 component)

The CMU will be an energy from waste generator and will consist of a steam turbine

Inactive • 2021-22 (T-4)
Seal Sands, Middlesbrough, TS2 1UB (31 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.48 MW
Seal Sands, Middlesborough, TS2 1UB (31 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.48 MW
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, Norfolk, PE34 3AL (4 components)
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated anciliary plant and buildings.
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated ancillary plant and buildings.
Active • 2028-29 (T-4), 2021-22 (T-4)
85.01 MW
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (16 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity of 5.050 MW.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.334 MW.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity of 5.290 MW.
Active • 2025-26 (T-1), 2023-24 (T-4) ...
16.06 MW
Red Roofs Nursery Limited North Moor Lane Cottingham HU16 4JN (5 components)

CHP engine supplying heat and power to agricultural greenhouses

Inactive • 2021-22 (T-4), 2018-19 (T-1)
1.20 MW
Red Roofs Nursery Limited Dunswell Road Cottingham Hull East Yorkshire HU16 4JT (4 components)

CHP engine supplying heat and power to agricultural greenhouses

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.80 MW
Racecourse Road Newbury West Berkshire RG14 7NZ (3 components)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.09 MW
Queensland Road, Islington, London, N7 7AJ (4 components)

A reciprocating gas engine CHP providing hot water to a local CHP network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.17 MW
Porters Way, Hillingdon, Greater London, UB7 9AA (11 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.59 MW
Port Causeway Bromborough Merseyside CH62 4TH (33 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
16.14 MW
Loading map...
Showing 25 locations