38 unique locations (882 components) - Page 1 of 2

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (15 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
9.05 MW
Thearne Lane Woodmansey Beverley HU17 0SA (6 components)

Two gas CHP engines in commercial horticultural environment with no auxilliary load

Active • 2025-26 (T-4), 2023-24 (T-4) ...
1.13 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (9 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2023-24 (T-4) ...
11.64 MW
Speke Operations, Fleming Rd, Liverpool L24 9LN (9 components)
• 2 x gas turbines with a total rated gross power capacity of 6.830 MW and total net power capacity of 6.807
• Speke combined heat and power plant.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (13 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
• 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 MW.
• 2X gas reciprocating engines with a total gross power capacity of 3.973 MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.63 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (14 components)

8.3MW Gas Turbine installation

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.47 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.23 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (27 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
103.57 MW
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (14 components)

Two gas CHP in a horticultural environment with no aux load

Active • 2025-26 (T-4), 2024-25 (T-4) ...
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (18 components)

Energy from Waste Recovery Facility

Active • 2028-29 (T-4), 2026-27 (T-4) ...
201.60 MW
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (18 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
47.83 MW
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (16 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity of 5.050 MW.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.334 MW.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity of 5.290 MW.
Active • 2025-26 (T-1), 2023-24 (T-4) ...
16.06 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (10 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2024-25 (T-1) ...
1165.32 MW
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (12 components)
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
14.85 MW
Priory Street, Ware, Hertfordshire, SG12 0DJ (18 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Park Road, Ware. Hertfordshire, SG12 0DP (35 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
6.35 MW
Ottringham Road Keyingham Hull North Humberside HU12 9RX (12 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
North Lonsdale Road, Cumbria, Ulverston, LA12 9DR (23 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Ninewells Hospital, Dundee, DD2 1UB (13 components)
• A Packaged 3.976MW, 11kV CHP
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Melrow Nursery, Rydings Lane, Southport PR9 8EB (18 components)

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Marsh Road, Banks, Southport PR9 8DX (27 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
4.21 MW
London Rd, Purfleet RM19 1SD (29 components)

Gas-fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
29.12 MW
Lhoist UK Ltd Hindlow Buxton SK17 0EL (21 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (16 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Haxby Rd, York, YO91 1XY (20 components)
• CHP Unit
• Gas fired CHP unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4.64 MW
Loading map...