CHP and autogeneration

14 unique locations (491 components)

1 Thane Road West, Nottingham, NG2 3AA (155 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
178.43 MW
Cargill PLC, Trafford Park, M17 1PA (30 components)

Siemens SGT200 Based CHP

Active • 2028-29 (T-4), 2025-26 (T-4) ...
94.67 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (80 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2025-26 (T-4) ...
93.80 MW
Drakemyre, Dalry KA24 5JJ (44 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2026-27 (T-4) ...
83.08 MW
Plot 3, Barrow Man Road, Birchington CT7 0AX (22 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
17.46 MW
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (11 components)

Two CHP gas engines in commercial horticultural environment with no auxilliary load

Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.05 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (22 components)

CHP engine in a horticultural environment, natural gas, no aux load

Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.72 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (10 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2024-25 (T-1) ...
1165.32 MW
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (18 components)

Energy from Waste Recovery Facility

Active • 2028-29 (T-4), 2026-27 (T-4) ...
201.60 MW
Saltend Power Station Saltend Hull HU12 8GA (34 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3486.78 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.23 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (11 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2023-24 (T-4) ...
11.64 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (24 components)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (16 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
9.05 MW
Loading map...
Showing 14 locations