Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CHP and autogeneration

7 unique locations (132 components)

The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (24 components)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (11 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2023-24 (T-4) ...
11.64 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (22 components)

CHP engine in a horticultural environment, natural gas, no aux load

Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.72 MW
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (11 components)

Two CHP gas engines in commercial horticultural environment with no auxilliary load

Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.05 MW
Plot 3, Barrow Man Road, Birchington CT7 0AX (22 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
17.46 MW
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (17 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.84 MW
Galley Hill Road Waltham Abbey Essex EN9 2AG (25 components)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.90 MW
Loading map...
Showing 7 locations