13 unique locations (512 components)

100 Montifichet Road, Westfield, Stratford E20 1GR (72 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.51 MW
Ashgrove Road West, Aberdeen AB16 5UL (26 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.54 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (57 components)
• !MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.83 MW
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (47 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• 3MW Diesel Generators at Excel Exhibition Energy Centre London
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.82 MW
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (53 components)
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.25 MW
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (17 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.84 MW
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (36 components)

Combined Heat and Power Plant Olympic Park London

Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.93 MW
Montgomery Road, Aberdeen AB24 2YA (28 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.78 MW
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (25 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.80 MW
Newton Aycliffe CO Durham DL5 6EA (68 components)
• This is a long standing existing CHP unit located on land within a manufacturing site.
• This is an existing CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
166.42 MW
Saltend Power Station Saltend Hull HU12 8GA (34 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3486.78 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.23 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.33 MW