Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Coal

8 unique locations (697 components)

Ratcliffe-on-Soar Nottingham NG11 0EE (100 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe Unit 3 coal-fired unit
Active • 2023-24 (T-4), 2024-25 (T-4) ...
3602.30 MW
31252.77 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (60 components)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 6)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2022-23 (T-4), 2023-24 (T-4) ...
4371.10 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (119 components)
• West Burton A Power Station CMU 2 WA2-19 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
Active • 2023-24 (T-1), 2023-24 (T-4) ...
2450.85 MW
EDF Energy (Thermal Generation) Limited, Cottam Power Station, Outgang Lane, Cottam, Retford, DN22 0NP (45 components)
• Cottam Power Station Combined CMU CTC-19 = 100% (T_COTPS-1) + 100% (T_COTPS-2)+ 100% (T_COTPS-3) +100% (T_COTPS-4) +100% (T_COTPS-S) Component T_COTPS-1 = 100% (T_COTPS-1) +25%(T_COTPS-S)
• Cottam Power Station Combined CMU CTC-19 = 100% (T_COTPS-1) + 100% (T_COTPS-2)+ 100% (T_COTPS-3) +100% (T_COTPS-4) +100% (T_COTPS-S) Component T_COTPS-2 = 100% (T_COTPS-2) +25%(T_COTPS-S)
• Cottam Power Station Combined CMU CTC-19 = 100% (T_COTPS-1) + 100% (T_COTPS-2)+ 100% (T_COTPS-3) +100% (T_COTPS-4) +100% (T_COTPS-S) Component T_COTPS-3 = 100% (T_COTPS-3) +25%(T_COTPS-S)
Inactive • 2019-20 (T-1), 2020-21 (T-1) ...
1528.52 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (19 components)

Aberthaw 7 Coal fired unit

Active • 2021-22 (T-4), 2022-23 (T-3) ...
466.15 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (92 components)
• Aberthaw 7 OCGT fuel type gasoil
• Aberthaw 8 OCGT fuel is distillate
• Aberthaw 9 OCGT fuel type is gasoil
Active • 2021-22 (T-4), 2022-23 (T-3) ...
2434.55 MW
Loading map...
Showing 8 locations